Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> BID ITEM A-16 & B-14: CRUSHED SURFACING TOP COURSE (CSTC) <br /> Measurement and Payment: Unit Price per Ton <br /> ' The unit price per ton for CSTC shall be full compensation for all labor, material, incidentals, <br /> tools, and equipment necessary to furnish, haul, stockpile, place, grade, and compact of CSTC <br /> for the work as required, from a Contractor-supplied source in accordance with the Contract <br /> Documents. Only solo dump trucks may be used in the area of the project. <br /> The unit price for CSTC also includes all costs for controlling moisture content. <br /> Also to be included in this bid item shall be CSTC under cement concrete driveways and <br /> sidewalks; and subgrade preparation, the cost of grader work, or any other equipment required <br /> to compaction of native subgrade material and spread and compact the crushed surfacing <br /> uniformly. <br /> During dry periods as determined by the Engineer, the Engineer may require water sprinkling <br /> prior to placement of the crushed surfacing and while spreading and compacting the material. <br /> The cost of such sprinkling shall be included in the unit price bid for crushed surfacing. <br /> Measurement for CSTC shall be by the ton, recorded on certified weight tickets per Section 1- <br /> 09.2 for Weighing Equipment and placed within the limits of dimensions defined in the Contract <br /> Documents, or as otherwise approved by the Engineer. CSTC material placed shall not exceed <br /> "neatline" quantities without advance authorization by the Inspector. <br /> BID ITEM A-17 & B-15: CRUSHED SURFACING BASE COURSE (CSBC) <br /> Measurement and Payment: Unit Price per Ton <br /> The unit price per ton for CSBC shall be full compensation for all labor, material, incidentals, <br /> tools, and equipment necessary to furnish, haul, stockpile, place, grade, and compaction of <br /> CSBC for the work as required, from a Contractor supplied source in accordance with the <br /> Contract Documents. Only solo dump trucks may be used in the area of the project. <br /> The unit price for CSBC also includes all costs for controlling moisture content. <br /> Also to be included in this bid item shall be the cost of grader work, or any other equipment <br /> required for compaction of native subgrade material and all equipment required to spread and <br /> compact the crushed surfacing uniformly. <br /> ' During dry periods as determined by the Engineer, the Engineer may require water sprinkling <br /> prior to placement of the crushed surfacing and while spreading and compacting the material. <br /> The cost of such sprinkling shall be included in the unit price bid for crushed surfacing. <br /> Measurement for CSBC shall be by the ton, recorded on certified weight tickets per Section 1- <br /> 09.2 for Weighing Equipment and placed within the limits of dimensions defined in the Contract <br /> Documents, or as otherwise approved by the Engineer. CSBC material placed shall not exceed <br /> "neatline" quantities without advance authorization by the Inspector. <br /> I <br /> I <br /> SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER"M" PHASE II <br /> WO No.— UP3470-10 Division D— BID ITEM DESCRIPTIONS April 2016 <br /> SP -37 <br />