KLB Construction 6/22/2016
>
Contracts
>
Capital Contract
>
KLB Construction 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2017 10:42:19 AM
Creation date
7/13/2016 11:44:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction
Approval Date
6/22/2016
Council Approval Date
5/25/2016
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer M Project Phase 2
Public Works WO Number
UP 3470
Tracking Number
0000165
Total Compensation
$4,474,693.51
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB Construction Inc. 7/17/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS 1 <br /> BID ITEM A-18 & B-16: GRAVEL BORROW INCLUDING HAUL , <br /> Measurement and Payment: Unit Price per Ton <br /> The unit price per ton for gravel borrow shall be full compensation for all labor, material, ' <br /> incidentals, tools and equipment necessary to furnish gravel borrow or bank run for trench <br /> backfill and other work as required, from a Contractor-supplied source in accordance with <br /> Section 2-03.3(14)J of the Standard Specifications and Contract Documents. Only solo dump <br /> trucks may be used in the area of the project. <br /> The unit price for gravel borrow shall also include all costs for furnishing, hauling, stockpiling, <br /> moisture control measures, placing, grading and compacting the material in place. Materials <br /> may not be stockpiled on the project site. <br /> Also to be included in this bid item shall be the cost of grader work, or any other equipment 1 <br /> required for compaction of native subgrade material and Gravel Borrow used as fill for sidewalk <br /> subgrade. <br /> 111 <br /> Measurement for gravel borrow shall be by the ton, recorded on certified weight tickets per <br /> Section 1-09.2 Weighing Equipment and placed within limits of dimensions defined in the <br /> Contract Documents, or as otherwise approved by the Engineer. <br /> BID ITEM A-19 & B-17: CEMENT CONCRETE UNDER ASPHALT PAVEMENT <br /> Measurement and Payment: Unit Price per Cubic Yard I <br /> Removal and Replacement of cement concrete under asphalt roadways will be measured by the <br /> cubic yard, based on the actual width, length, and depth of the concrete placed. <br /> The unit Contract price per cubic yard shall be full payment for all costs to complete the Work as <br /> specified, removal and disposal of the existing concrete off of the Contracting Agency's Right of <br /> Way, preparing the surfacing or subgrade below the new concrete, furnishing and placing the <br /> cement concrete, and for all incidentals required to complete the Work as specified in the <br /> Construction Documents and per Section 5-05. 1 <br /> Gravel Borrow, Bid Item A-12 and B-16, placed below cement concrete will be measured and <br /> paid for separately. <br /> I <br /> I <br /> I <br /> I <br /> SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER "M" PHASE II <br /> WO No.- UP3470-10 Division D- BID ITEM DESCRIPTIONS April 2016 <br /> SP -38 <br />