Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS 1 <br /> BID ITEM A-18 & B-16: GRAVEL BORROW INCLUDING HAUL , <br /> Measurement and Payment: Unit Price per Ton <br /> The unit price per ton for gravel borrow shall be full compensation for all labor, material, ' <br /> incidentals, tools and equipment necessary to furnish gravel borrow or bank run for trench <br /> backfill and other work as required, from a Contractor-supplied source in accordance with <br /> Section 2-03.3(14)J of the Standard Specifications and Contract Documents. Only solo dump <br /> trucks may be used in the area of the project. <br /> The unit price for gravel borrow shall also include all costs for furnishing, hauling, stockpiling, <br /> moisture control measures, placing, grading and compacting the material in place. Materials <br /> may not be stockpiled on the project site. <br /> Also to be included in this bid item shall be the cost of grader work, or any other equipment 1 <br /> required for compaction of native subgrade material and Gravel Borrow used as fill for sidewalk <br /> subgrade. <br /> 111 <br /> Measurement for gravel borrow shall be by the ton, recorded on certified weight tickets per <br /> Section 1-09.2 Weighing Equipment and placed within limits of dimensions defined in the <br /> Contract Documents, or as otherwise approved by the Engineer. <br /> BID ITEM A-19 & B-17: CEMENT CONCRETE UNDER ASPHALT PAVEMENT <br /> Measurement and Payment: Unit Price per Cubic Yard I <br /> Removal and Replacement of cement concrete under asphalt roadways will be measured by the <br /> cubic yard, based on the actual width, length, and depth of the concrete placed. <br /> The unit Contract price per cubic yard shall be full payment for all costs to complete the Work as <br /> specified, removal and disposal of the existing concrete off of the Contracting Agency's Right of <br /> Way, preparing the surfacing or subgrade below the new concrete, furnishing and placing the <br /> cement concrete, and for all incidentals required to complete the Work as specified in the <br /> Construction Documents and per Section 5-05. 1 <br /> Gravel Borrow, Bid Item A-12 and B-16, placed below cement concrete will be measured and <br /> paid for separately. <br /> I <br /> I <br /> I <br /> I <br /> SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER "M" PHASE II <br /> WO No.- UP3470-10 Division D- BID ITEM DESCRIPTIONS April 2016 <br /> SP -38 <br />