KLB Construction 6/22/2016
>
Contracts
>
Capital Contract
>
KLB Construction 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2017 10:42:19 AM
Creation date
7/13/2016 11:44:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction
Approval Date
6/22/2016
Council Approval Date
5/25/2016
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer M Project Phase 2
Public Works WO Number
UP 3470
Tracking Number
0000165
Total Compensation
$4,474,693.51
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB Construction Inc. 7/17/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> ' accordance with the Contract Documents. The cost of removing existing driveways and <br /> alleyway approaches, associated sidewalk, and haul and disposal is incidental and shall be <br /> included in the unit price for this bid item. <br /> Crushed surfacing top course placed below cement concrete will be measured and paid for <br /> separately in accordance with other bid items. <br /> Deductions will be made for castings or other discontinuities in the driveway, where castings or <br /> discontinuities are 9 square feet or larger. <br /> Adjusting existing valve boxes, manhole covers, and other features to match finish driveway <br /> grade is to be included in this bid item with no direct compensation made. <br /> BID ITEM A-42 & B-38: CEMENT CONCRETE SIDEWALK, 4-INCH THICKNESS <br /> Measurement and Payment: Unit Price per Square Yard <br /> The unit price per square yard of Cement Concrete Sidewalk, 4-Inch Thick and Cement <br /> Concrete Sidewalk, Driveway and Alley Approach, 6-Inch thick shall be full compensation for <br /> replacement or installation of concrete sidewalk, driveway or alley approach impacted by <br /> construction activities and/or where shown on the Contract Plans in accordance with the <br /> Contract Documents. <br /> The costs of removing existing sidewalks, haul and disposal, and constructing pedestrian curbs <br /> associated with curb ramps and sidewalk construction are incidental in the unit price for this bid <br /> item. <br /> ' Measurement shall be per square yard as delineated by the Contractor and approved by the <br /> Inspector prior to removal. <br /> Deductions will be made for blocked out areas, castings, or other discontinuities in the sidewalk, <br /> which are 9 square feet or larger. <br /> ' Gravel borrow to be used as fill for sidewalk subgrade will be measured and paid for separately <br /> in accordance with other applicable Contract bid items. <br /> ' Crushed surfacing top course placed below cement concrete will be measured and paid for <br /> separately in accordance with other applicable Contract bid items. <br /> ' The cost of sawcutting concrete sidewalk is incidental and shall be included in the unit price for <br /> this bid item. <br /> ' The unit contract price for this Bid item shall include all costs for the work required to construct <br /> the sidewalk as specified, including the earth work required to excavate excess material to <br /> achieve design subgrade elevations. <br /> ' Adjusting existing valve boxes, manhole covers, and other features to match finish sidewalk <br /> grade is to be included in this bid item with no direct compensation made. <br /> I <br /> I <br /> SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER "M" PHASE II <br /> WO No.—UP3470-10 Division D—BID ITEM DESCRIPTIONS April 2016 <br /> SP -47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.