My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction 6/22/2016
>
Contracts
>
Capital Contract
>
KLB Construction 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2017 10:42:19 AM
Creation date
7/13/2016 11:44:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction
Approval Date
6/22/2016
Council Approval Date
5/25/2016
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer M Project Phase 2
Public Works WO Number
UP 3470
Tracking Number
0000165
Total Compensation
$4,474,693.51
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB Construction Inc. 7/17/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS , <br /> BID ITEM A-43 & B-39: CONCRETE PERPENDICULAR CURB RAMP ' <br /> Measurement and Payment: Unit Price per Each <br /> Pay limits for Concrete Perpendicular Curb Ramp shall be in accordance with drawing number , <br /> C484. <br /> Concrete Perpendicular Curb Ramp shall be per WSDOT Standard Plan F-40.15-02, and these <br /> Special Provisions. The unit price for this bid item shall include all labor, materials, equipment, <br /> and related work necessary to build the curb ramps as specified on the Plans and as directed by <br /> the Engineer. , <br /> Also included in this bid item is earthwork required to excavate excess material or place fill to <br /> achieve design subgrade elevations. , <br /> The costs of sawcutting concrete curb ramps, removing existing sidewalks, curb ramps, and <br /> haul and disposal are incidental in the unit price for this Bid item. <br /> Crushed surfacing top course placed below cement concrete will be measured and paid for <br /> separately in accordance with other applicable Contract bid items. <br /> Adjusting existing valve boxes, manhole covers, and other features to match finish ramp grade <br /> is to be included in this bid item with no direct compensation made. <br /> BID ITEM A-44 & B-40: CONCRETE PARALLEL CURB RAMP <br /> Measurement and Payment: Unit Price per Each <br /> Pay limits for Concrete Parallel Curb Ramp shall be in accordance with drawing number C484. <br /> Concrete Parallel Curb Ramp shall be per WSDOT Standard Drawing F-40.12-02, and these <br /> 111 <br /> Special Provisions. The unit price for this bid item shall include all labor, materials, equipment, <br /> and related work necessary to build the curb ramps as specified on the Plans and as directed by <br /> the Engineer. , <br /> Also included in this bid item is earthwork required to excavate excess material or place fill to <br /> achieve design subgrade elevations. <br /> The costs of sawcutting concrete curb ramps, removing existing sidewalks, curb ramps, and <br /> haul and disposal are incidental in the unit price for this Bid item. <br /> Crushed surfacing top course placed below cement concrete will be measured and paid for <br /> separately in accordance with other applicable Contract bid items. <br /> Adjusting existing valve boxes, manhole covers, and other features to match finish ramp grade <br /> is to be included in this bid item with no direct compensation made. <br /> I <br /> I <br /> SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER"M" PHASE II <br /> WO No.- UP3470-10 Division D- BID ITEM DESCRIPTIONS April 2016 <br /> SP -48 111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.