Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> Traffic: Both vehicular and non-vehicular traffic, such as pedestrians, bicyclists, <br /> wheelchairs, and equestrian traffic. <br /> Unabsorbed Overhead: The reduction or loss of contribution to recovery of the <br /> Contractor's Overhead costs realized by the result of reduced Project or Contractor <br /> billings, or both, due to any reason whatsoever, including a Project extension. <br /> Unit Price Work: Refers to items of Work identified by unit prices in the Proposal. <br /> 1-02 BID PROCEDURES AND CONDITIONS <br /> 1-02.1 Pre qualifications of Bidders , <br /> Delete 1-02.1 and substitute the following: <br /> 1-02.1 Bidder Responsibility Criteria <br /> (******) <br /> 1-02.1(1) Mandatory Bidder Responsibility Criteria <br /> Bidder shall meet mandatory responsibility criteria in accordance with RCW <br /> 39.04.350(1). The City may require the Bidder to submit documentation demonstrating <br /> compliance with the criteria under this 1-02.1(1). The Bidder must: <br /> 1. Registration. Have a current certificate of registration as a contractor in compliance <br /> with chapter 18.27 RCW, which must have been in effect at the time of Bid <br /> submittal; and <br /> 2. UBI. Have a current Washington Unified Business Identifier (UBI) number; and <br /> 3. State Requirements. If applicable: <br /> a. Have Industrial Insurance (workers' compensation) coverage for the bidder's <br /> employees working in Washington, as required in Title 51 RCW; <br /> b. Have a Washington Employment Security Department number, as required in <br /> Title 50 RCW; <br /> c. Have a Washington Department of Revenue state excise tax registration <br /> number, as required in Title 82 RCW; and <br /> 4. Disqualification. Not be disqualified from bidding on any public works contract <br /> under RCW 39.06.010 or 39.12.065(3). <br /> 5. Apprentices. If the Project is subject to the apprenticeship utilization requirements <br /> in RCW 39.04.320, not have been found out of compliance by the Washington state <br /> apprenticeship and training council for working apprentices out of ratio, without <br /> appropriate supervision, or outside their approved work processes as outlined in <br /> their standards of apprenticeship under chapter 49.04 RCW for the one-year period <br /> immediately preceding the date of the bid solicitation. <br /> 1-02.1(2) Supplemental Bidder Responsibility Criteria <br /> (******) <br /> This Project will not be subject to supplemental bidder responsibility criteria. <br /> 1-02.2 Plans and Specifications <br /> Delete all paragraphs in 1-02.2 and substitute the following: <br /> Information as to where Bid Documents can be obtained or reviewed will be found in <br /> the Call for Bids (Advertisement for Bids) for the Work. <br /> SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER "M" PHASE II <br /> WO No.- UP3470-10 Division 1 -GENERAL REQUIREMENTS April 2016 <br /> SP-64 <br />