My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A-1 Landscaping and Construction, Inc. 7/20/2016
>
Contracts
>
Capital Contract
>
A-1 Landscaping and Construction, Inc. 7/20/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2017 10:01:15 AM
Creation date
7/25/2016 11:25:59 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
A-1 Landscaping and Construction, Inc.
Approval Date
7/20/2016
Council Approval Date
6/22/2016
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Riverfront Development North Wetland Complex
Public Works WO Number
RD-3312
Tracking Number
0000177
Total Compensation
$598,750.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
A-1 Landscaping & Construction, Inc. 6/22/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 take down these signs, posts, or supports. All signs, posts, and supports shall be <br /> 2 removed from the project and shall remain the property of the Contractor. <br /> 3 There shall be no separate classification of signs. All construction signs, whether used <br /> 4 throughout the construction, during a major phase of construction or removed daily shall <br /> I 5 be paid under the item "Project Temporary Traffic Control". Portable or temporary <br /> 6 mountings may require added weight for stability. If it is necessary to add weight to the <br /> 7 signs, only a bag of sand that will rupture on impact shall be used. The bag of sand <br /> I 8 shall have a maximum weight of 40 pounds and shall be suspended no more than 1' <br /> 9 from the ground. <br /> 10 The work to provide the construction signing shall be: <br /> 11 1. Furnishing all construction signs. <br /> 12 2. Furnishing, removing, and disposing of the posts or supports for the signs. <br /> 13 3. Initial installation and subsequent removal of all construction signs. <br /> I 14 4. Furnishing labor and materials for maintaining the signs in a clean and <br /> 15 presentable condition; <br /> 16 5. All other incidentals necessary for providing the construction signs according to <br /> 17 the approved traffic control plan(s). <br /> 18 Signs, posts, or supports that are lost, stolen, destroyed, or which the Engineer deems <br /> 19 to be unacceptable, while their use is required on the project, shall be replaced by the <br /> 20 Contractor without additional compensation. <br /> I 21 <br /> 22 <br /> 23 1-10.4 Measurement <br /> I 24 <br /> 25 Section 1-10.4 is modified to read as follows: <br /> 26 <br /> I 27 When the bid proposal does not include an item for any necessary traffic control, all <br /> 28 costs for traffic control shall be included, by the Contractor, in the unit contract price for <br /> 29 the various other items of work in the bid proposal. The Contractor shall estimate these <br /> I 30 costs based on the contemplated work procedures. <br /> 31 When traffic control items are included in the bid proposal, payment is limited to the <br /> 32 following areas: <br /> 33 1. The entire project area under the contract and for a distance to include the initial <br /> I34 warning signs for the beginning of the project and the end of construction. <br /> 35 Warning signs for side roads on the approved traffic control plan are also <br /> 36 included. If the project consists of two or more sections, the limits will apply to <br /> 37 each section individually. <br /> 38 2. A detour provided in the plans or approved by the Engineer for by-passing all or <br /> 39 any portion of the construction, irrespective of whether or not the termini of the <br /> I 40 detour are within the limits of the contract. <br /> 41 The provisions of Section 1-04.6 will not apply to any traffic control or traffic control <br /> 42 items. However, the item "Project Temporary Traffic Control"will be considered for an <br /> I 43 equitable adjustment only when the total contract price increases or decreases by more <br /> 44 than 25%. <br /> 45 <br /> I <br /> 46 <br /> 47 The measurement and payment for the items included in the bid proposal for traffic <br /> control costs incurred within the limits of 1 and 2 above will be made to the Contractor by <br /> 48 the City as described in these Special Provisions. <br /> I 59 <br /> 50 1-10.4(1) Lump Sum Bid for Project <br /> 51 <br /> 52 Section 1-10.4(1) is supplemented as follows: <br /> I <br /> IRIVERFRONT DEVELOPMENT NORTH WETLAND COMPLEX 97 <br />
The URL can be used to link to this page
Your browser does not support the video tag.