Laserfiche WebLink
1 <br /> 2 When the bid proposal includes an item for"Project Temporary Traffic Control", the work <br /> 3 required for this item shall be that described in Section 1-10 and including: <br /> 4 1. Furnish and maintain signs, cones, barricades, flasher, and other <br /> 5 channelization devices; <br /> 6 2. Provide supervisory personnel for all labor for traffic control; <br /> 7 3. Provide labor and any necessary vehicle(s) for set-up and removal of <br /> 8 construction signs and the traffic control devices which are placed daily; <br /> 9 4. Provide labor and vehicles for patrolling and maintaining in position all of the <br /> 10 construction signs and the traffic control devices; <br /> 11 5. Provide labor, material, and equipment necessary for flagging, cleaning up, <br /> 12 removing and replacing all construction signs and traffic control devices that <br /> 13 are destroyed, damaged or lost during the life of the project; <br /> 14 6. Provide flagging or use of police officers for the convenience of the <br /> 15 Contractor, such as facilitating movement of equipment on the site, laying out <br /> 16 or relocating traffic control devices and signs. <br /> 17 <br /> 18 Upon failure of the Contractor to immediately provide flaggers, erect, maintain, and <br /> 19 remove signs; or provide, erect, maintain, and remove other traffic control devices when <br /> 20 ordered to do so by the Engineer, the City may without further notice to the Contractor or <br /> 21 the surety, perform any of the above and deduct all of the costs from the Contractor's <br /> 22 payments. <br /> 23 <br /> 24 The Contractor shall be responsible for providing adequate flaggers, signs, and other <br /> 25 traffic control devices for the protection of the worker and the public at all times <br /> 26 regardless of whether or not the flaggers, signs, and other traffic control devices are <br /> 27 ordered by the Engineer, or paid for by the City. The Contractor shall be liable for <br /> 28 injuries and damages to persons and property suffered by reason of the Contractor's <br /> 29 operations or any negligence in connection therewith. <br /> 30 <br /> 31 There will be no specific unit of measurement applied to the lump sum item of"Project <br /> 32 Temporary Traffic Control". <br /> 33 <br /> 34 1-10.5(2) Item Bids with Lump Sum for Incidentals <br /> 35 <br /> 36 Section 1-10.5(2) is modified as follows: <br /> 37 <br /> 38 Delete the paragraphs pertaining to: <br /> 39 "Other Traffic Control Labor:, Per Hour <br /> 40 "Construction Signs Class A", Per square foot <br /> 41 "Other Traffic Control Labor", Per Lump Sum <br /> 42 "Portable Traffic Control Signs", Per lump sum <br /> I <br /> I <br /> I <br /> RIVERFRONT DEVELOPMENT NORTH WETLAND COMPLEX 98111 <br />