My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A-1 Landscaping and Construction, Inc. 7/20/2016
>
Contracts
>
Capital Contract
>
A-1 Landscaping and Construction, Inc. 7/20/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2017 10:01:15 AM
Creation date
7/25/2016 11:25:59 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
A-1 Landscaping and Construction, Inc.
Approval Date
7/20/2016
Council Approval Date
6/22/2016
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Riverfront Development North Wetland Complex
Public Works WO Number
RD-3312
Tracking Number
0000177
Total Compensation
$598,750.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
A-1 Landscaping & Construction, Inc. 6/22/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> 1 Division 2 <br /> 2 Earthwork <br /> 3 <br /> 4 Clearing, Grubbing, and Roadside Cleanup <br /> I 5 <br /> 6 Section 2-01 is supplemented with the following: <br /> 7 <br /> 8 (******) <br /> 9 Selective Tree Removal <br /> 10 <br /> Ii 1 Preparation of a Tree Removal Plan <br /> 12 The Contractor shall prepare and implement a project-specific Tree Removal Plan. The <br /> 13 Contractor shall submit the plan to the Owner's Representative no later than the date of the <br /> 14 preconstruction conference. No on-site construction activities may commence until the Owner's <br /> 15 Representative accepts a Tree Removal Plan for the project. The Tree Removal Plan shall <br /> 16 describe the schedule, process, and procedures for the removal of each individual tree to be <br /> 17 removed as shown on the Plans. The Tree Removal Plan shall identify and demonstrate how <br /> 18 the Contractor will complete the work in accordance with the ANSI requirements referenced in <br /> 19 this section. The Plan shall specifically identify equipment, devices, cranes, or special rigging <br /> 20 that will be used. The Plan shall identify project-specific work procedures that the Contractor <br /> 21 will follow to protect the safety of climbers, non-involved workers, public, staff, and property. <br /> 22 The plan shall include the identification of drop zones, the location of planned retreat/escape <br /> 23 paths, on-site log storage areas, and the Contractor's plans for loading and disposing of logs <br /> ' 24 and associated debris. <br /> 25 <br /> 26 Tree Removal <br /> 27 Tree removal work shall be performed under the direction of a qualified arborist and shall be <br /> 28 conducted by experienced climbers and equipment operators. Tree removal work shall conform <br /> 29 to ANSI Z133.1 — Safety Requirements for Arboricultural Operations. <br /> 30 <br /> 31 Pruning <br /> 32 If the Contractor determines that it is necP8sary to prune trees or Chrl Ills to minimize damage to <br /> 33 remaining vegetation or safely conduct tree removal, pruning work shall conform to ANSI A300 <br /> 34 (Part 1) — Pruning. <br /> 35 <br /> 36 Tree Disposal <br /> 37 Tree disposal shall be in accordance with 2-01.2. <br /> 38 <br /> 39 <br /> 40 Disposal of Usable Material and Debris <br /> 41 <br /> 42 The second paragraph of Section 2-01.2 is deleted and replaced with the following: <br /> 43 <br /> 44 (******) <br /> 45 Contractor shall dispose of all debris by one or more of the disposal methods described <br /> 46 below. Disposal Method No. 1 - Open Burning and Disposal Method No. 3 — Chipping shall <br /> 47 not be allowed. <br /> 48 <br /> 49 Sections 2-01.2(1) and 2-01.2(3) are deleted in their entirety. <br /> 50 <br /> 51 Section 2-01.2 is supplemented with the following: <br /> 52 <br /> 1 RIVERFRONT DEVELOPMENT NORTH WETLAND COMPLEX 99 <br />
The URL can be used to link to this page
Your browser does not support the video tag.