Laserfiche WebLink
I <br /> 1 "Hazardous Material Excavation Incl. Haul", per force account. <br /> 2 The unit contract price for"Hazardous Material Excavation Incl. Haul" shall be full pay for all <br /> 3 costs associated with excavating the material designated to be removed, hauling it to the <br /> 4 stockpile location, and stockpiling the excavated material. <br /> I 5 <br /> 6 Watering <br /> 7 <br /> I 8 Section 2-07.3 is revised to read as follows: <br /> 9 <br /> 10 (******) <br /> I 11 Only the Owner and Owner's Representative may authorize the operation of City fire hydrants <br /> 12 or making connections to City water mains. Upon obtaining said permission, the following shall <br /> 13 apply: <br /> 14 1. The Contractor shall use only those hydrants designated by the agency in charge of <br /> I15 water distribution and in strict accordance with its requirements for hydrant use. A <br /> 16 hydrant use permit must be obtained by contacting the Utilities dispatcher. <br /> 17 2. The Contractor shall secure permission from and comply with all requirements of <br /> 18 the water utility before obtaining water from the fire hydrants. The Engineer shall <br /> 19 also be notified by the Contractor of such permission as soon as granted. <br /> 20 3. The Contractor shall use hydrant wrenches only to open hydrants. He shall also <br /> I 21 make certain that the hydrant valve is open "full" since "cracking" the valve caused <br /> 22 damage to the valve.An approved auxiliary valve shall be provided on the outlet line <br /> 23 for control purposes. Fire hydrant valves must be closed slowly to avoid a surge in <br /> I <br /> 24 <br /> 25 the system which creates undue pressure on water lines. The Contractor shall <br /> carefully note the importance of following these directions. <br /> 26 4. If one of the Contractor's employees shall knowingly or unknowingly use the wrong <br /> I 27 wrench on a hydrant and thereby damage the hydrant valve stem, the Contractor <br /> 28 will be responsible. He shall immediately notify the water utility so that the damage <br /> 29 can be repaired as quickly as possible. <br /> ' 30 5. Upon completing the use of the hydrants, the Contractor shall notify the water <br /> 31 distribution agency so that the hydrants may be then inspected for possible <br /> 32 damage. Any damage resulting from the use of the hydrants by the Contractor will <br /> 33 be repaired by the water agency, and the cost thereof shall, if necessary, be <br /> 1 34 withheld from the final payment to the Contractor. <br /> 35 6. Violation of these requirements will result in fines and will lay the Contractor liable <br /> 36 for damage suits because of malfunctioning of damaged fire hydrants, in the event <br /> I 37 of fire. <br /> 38 7. Dust shall be controlled by spraying exposed earth and gravel surfaced roads with <br /> 39 water at least two times per day or more often as necessary to prevent migration of <br /> I 40 dust outside the construction zone. <br /> 41 <br /> 42 Measurement <br /> I 43 <br /> 44 Section 2-07.4 is deleted and replaced with the following: <br /> 45 <br /> 46 (******) <br /> II 47 No Measurement shall be made for water. <br /> 48 <br /> 1 <br /> 49 Payment <br /> 50 <br /> 51 Section 2-07.5 is deleted and replaced with the following: <br /> 52 <br /> IRIVERFRONT DEVELOPMENT NORTH WETLAND COMPLEX 103 <br />