Laserfiche WebLink
1 soils, any manmade materials, and other materials identified by the Owner's <br /> 2 Representative. Unsuitable materials shall be confirmed by Owner's Representative <br /> 3 prior to removal and disposed offsite in accordance with Section 2-03.3(7)C and <br /> 4 these special provisions. If contaminated soils are encountered, shall be excavated, <br /> 5 handled and disposed in accordance with 2-02.5 "Hazardous Material Handling And I <br /> 6 Disposal <br /> 7 <br /> 8 7. Soil Dewatering <br /> 9 All material removed from the Special Excavation areas shall be adequately <br /> 10 dewatered prior to removal from the site. No soils containing excessive liquid, such <br /> 11 that water freely drains from the soil, shall be transported off site in any way without <br /> 12 proper dewatering and containment. <br /> 13 <br /> 14 8. Disposal of Suitable Material in Habitat Berm <br /> 15 Suitable shall be all excavated material not defined as unsuitable, as identified by <br /> 16 Owner's Representative. Suitable material excavated from the channel and <br /> 17 breaches shall be disposed by placement onsite within the habitat berm placement <br /> 18 areas. Material shall be compacted and shaped using an excavator bucket so that it <br /> 19 conforms to the lines and grades shown on the plans. The maximum deviation of the <br /> 20 final surface elevations shall not be greater than 0.5 feet. <br /> 21 <br /> 22 Habitat berm extents are approximate and may be adjusted by the Owner's <br /> 23 Representative to accommodate material placement. <br /> 24 <br /> 25 2-08.4 Measurement <br /> 26 "Channel Excavation" will be measured by the linear foot of channel, measured along the <br /> 27 centerline of the channel. <br /> 28 <br /> 29 "Breach Excavation" will be measured by the cubic yard. All excavated material will be <br /> 30 measured in the position it occupied before the excavation was performed. An original ground <br /> 31 measurement will be taken using cross-section or digital terrain modeling survey techniques. <br /> 32 For beach excavation, the original ground will be compared with the planned finished section <br /> 33 shown in the Plans. Slope/ground intercept points defining the limits of the measurement will be <br /> 34 as staked. 3 <br /> 35 <br /> 36 "Ditch Block" no measurement shall be made. <br /> 37 <br /> 38 "Unsuitable Material Disposal" will be measured per ton in the hauling vehicle. <br /> 39 <br /> 40 <br /> 41 2-08.5 Payment <br /> 42 Payment will be made in accordance with Section 1-04.1, for each of the following Bid items that <br /> 43 are included in the Proposal: <br /> 44 <br /> 45 Unit Contract Price for "Channel Excavation" shall be full pay for all costs incurred for work to <br /> 46 excavate Channels 1, 2, and 3 as shown in the Plans and to dispose of suitable excavated <br /> 47 materials within the habitat berm placement areas, including onsite handling, haul, loading, <br /> 48 placing, grading or otherwise disposing of the material. Preparation and implementation of the <br /> 49 Special Excavation Plan and Fish Exclusion Protocol Plan shall be incidental to Channel <br /> 50 Excavation. <br /> 51 <br /> 52 Unit Contract Price for "Breach Excavation" shall be full pay for all costs incurred for work to <br /> 53 excavate Breach 1 and Breach 2 as shown in the Plans and to dispose of suitable excavated , <br /> RIVERFRONT DEVELOPMENT NORTH WETLAND COMPLEX 106 <br />