My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A-1 Landscaping and Construction, Inc. 7/20/2016
>
Contracts
>
Capital Contract
>
A-1 Landscaping and Construction, Inc. 7/20/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2017 10:01:15 AM
Creation date
7/25/2016 11:25:59 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
A-1 Landscaping and Construction, Inc.
Approval Date
7/20/2016
Council Approval Date
6/22/2016
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Riverfront Development North Wetland Complex
Public Works WO Number
RD-3312
Tracking Number
0000177
Total Compensation
$598,750.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
A-1 Landscaping & Construction, Inc. 6/22/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 materials within the habitat berm placement areas, including onsite handling, haul, loading, <br /> ' 2 placing, grading or otherwise disposing of the material. Preparation and implementation of the <br /> 3 Special Excavation Plan and Fish Exclusion Protocol Plan shall be incidental to Channel <br /> 4 Excavation. <br /> 5 <br /> 6 The lump sum Contract price for "Ditch Block" shall be full pay for all labor, materials, tools, <br /> 7 plans and equipment necessary to perform the Work as specified. <br /> 8 <br /> 9 Unit Contract Price for "Unsuitable Material Disposal" shall be full pay for all costs incurred for <br /> 10 work to remove and dispose of unsuitable materials including handling, stockpiling, haul, <br /> 11 loading, placing, or otherwise disposing of the material at an offsite Contractor-provided <br /> 12 disposal site. <br /> 13 <br /> 14 <br /> 15 Division 8 <br /> 16 Miscellaneous Construction <br /> 17 <br /> 18 Erosion Control and Water Pollution Control <br /> 19 <br /> 20 Construction Requirements <br /> 21 <br /> 22 General <br /> 23 <br /> ' 24 Section 8-01.3(1) is supplemented with the following: <br /> 25 <br /> 26 (******) <br /> 27 The Contractor shall be responsible for all Work required for compliance with the <br /> 28 Construction Stormwater General Permit (CSWGP) including annual permit fees. <br /> 29 <br /> I 30 <br /> 31 The first through eighth paragraphs of Section 8-01.3(1) are deleted and replaced with the <br /> ii fniirnniinn <br /> 33 <br /> 34 (January 5, 2015) <br /> 35 The Contractor shall install a high visibility fence along the site preservation lines <br /> 36 shown in the Plans or as instructed by the Engineer. <br /> 1 37 <br /> 38 Throughout the life of the project, the Contractor shall preserve and protect the <br /> 39 delineated area, acting immediately to repair or restore any fencing damaged or <br /> ' 40 removed. <br /> 41 <br /> 42 Controlling pollution, erosion, runoff, and related damage requires the Contractor <br /> 43 to perform temporary Work items including but not limited to: <br /> 44 <br /> 45 1. Providing ditches, berms, culverts, and other measures to control surface <br /> 46 water. <br /> 47 <br /> 48 2. Building dams, settling basins, energy dissipaters, and other measures, <br /> ' 49 to control downstream flows. <br /> 50 <br /> 51 3. Controlling underground water found during construction. <br /> 1 52 <br /> RIVERFRONT DEVELOPMENT NORTH WETLAND COMPLEX 107 <br />
The URL can be used to link to this page
Your browser does not support the video tag.