Laserfiche WebLink
I <br /> 1 (******) <br /> I <br /> 2 All areas to be seeded shall be scarified to a 2" minimum depth. Remove all <br /> 3 undesirable weed or plant growth and all rocks and debris over 3" in diameter, and <br /> 4 dispose of material off-site. <br /> I 5 <br /> 6 Drive no heavy equipment over planting areas after soil preparation. <br /> 7 <br /> I <br /> 8 Seeding and Fertilizing <br /> 9 <br /> 10 Section 8-01.3(2)B is supplemented with the following: <br /> 1 11 <br /> 12 (******) <br /> 13 Uniformly apply seed mixes by handheld broadcast spreader after finish grading has been <br /> 14 completed and while the prepared native soil remains friable and weed free. <br /> 15 <br /> 16 Apply seed mixes in designated areas per Plan. <br /> 17 <br /> 18 Keep the premises clean, free of excess soils and other material, including refuse and <br /> 19 debris, resulting from the Contractor's work. At the conclusion of work, remove all surplus <br /> 20 seeding material and installation debris from the construction site and leave the project in a <br /> I <br /> 21 neat condition. <br /> 22 <br /> 23 Coir Log <br /> I 24 <br /> 25 The first sentence of 8-01.3(6)A is revised to read as follows: <br /> 26 <br /> I 27 (******) <br /> 28 Coir logs are used as erosion and sediment control or bank stabilizing device. Coir logs <br /> 29 shall be laid out, spaced, staked, and installed in accordance with the Plans. <br /> I 30 <br /> 31 Section 9-14.5(7) is supplemented with the following: <br /> 32 <br /> I33 Coir logs shall be 16-inches in diameter. <br /> 34 <br /> 35 Maintenance <br /> 36 <br /> I <br /> 37 (January 5, 2015) <br /> 38 The fifth paragraph of Section 8-01.3(15) is deleted. <br /> 39 <br /> I 40 Measurement <br /> 41 <br /> 42 Section 8-01.4 is supplemented with the following: <br /> I 43 <br /> 44 (August 3, 2015) <br /> 45 When the Bid Proposal contains the lump sum item "Erosion Control and Water Pollution <br /> 46 Prevention" there will be no measurement of unit or force account items for Work defined in <br /> 47 Section 8-01. If the Bid Proposal includes the Bid item "ESC Lead" the measurement is not <br /> 48 deleted and the Work under that item will be measured as specified. <br /> I 49 <br /> 50 (******) <br /> 51 No measurement will be made for "Water Control". <br /> I <br /> 52 <br /> I <br /> RIVERFRONT DEVELOPMENT NORTH WETLAND COMPLEX 111 <br />