My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A-1 Landscaping and Construction, Inc. 7/20/2016
>
Contracts
>
Capital Contract
>
A-1 Landscaping and Construction, Inc. 7/20/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2017 10:01:15 AM
Creation date
7/25/2016 11:25:59 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
A-1 Landscaping and Construction, Inc.
Approval Date
7/20/2016
Council Approval Date
6/22/2016
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Riverfront Development North Wetland Complex
Public Works WO Number
RD-3312
Tracking Number
0000177
Total Compensation
$598,750.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
A-1 Landscaping & Construction, Inc. 6/22/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 (******) <br /> I <br /> 2 All areas to be seeded shall be scarified to a 2" minimum depth. Remove all <br /> 3 undesirable weed or plant growth and all rocks and debris over 3" in diameter, and <br /> 4 dispose of material off-site. <br /> I 5 <br /> 6 Drive no heavy equipment over planting areas after soil preparation. <br /> 7 <br /> I <br /> 8 Seeding and Fertilizing <br /> 9 <br /> 10 Section 8-01.3(2)B is supplemented with the following: <br /> 1 11 <br /> 12 (******) <br /> 13 Uniformly apply seed mixes by handheld broadcast spreader after finish grading has been <br /> 14 completed and while the prepared native soil remains friable and weed free. <br /> 15 <br /> 16 Apply seed mixes in designated areas per Plan. <br /> 17 <br /> 18 Keep the premises clean, free of excess soils and other material, including refuse and <br /> 19 debris, resulting from the Contractor's work. At the conclusion of work, remove all surplus <br /> 20 seeding material and installation debris from the construction site and leave the project in a <br /> I <br /> 21 neat condition. <br /> 22 <br /> 23 Coir Log <br /> I 24 <br /> 25 The first sentence of 8-01.3(6)A is revised to read as follows: <br /> 26 <br /> I 27 (******) <br /> 28 Coir logs are used as erosion and sediment control or bank stabilizing device. Coir logs <br /> 29 shall be laid out, spaced, staked, and installed in accordance with the Plans. <br /> I 30 <br /> 31 Section 9-14.5(7) is supplemented with the following: <br /> 32 <br /> I33 Coir logs shall be 16-inches in diameter. <br /> 34 <br /> 35 Maintenance <br /> 36 <br /> I <br /> 37 (January 5, 2015) <br /> 38 The fifth paragraph of Section 8-01.3(15) is deleted. <br /> 39 <br /> I 40 Measurement <br /> 41 <br /> 42 Section 8-01.4 is supplemented with the following: <br /> I 43 <br /> 44 (August 3, 2015) <br /> 45 When the Bid Proposal contains the lump sum item "Erosion Control and Water Pollution <br /> 46 Prevention" there will be no measurement of unit or force account items for Work defined in <br /> 47 Section 8-01. If the Bid Proposal includes the Bid item "ESC Lead" the measurement is not <br /> 48 deleted and the Work under that item will be measured as specified. <br /> I 49 <br /> 50 (******) <br /> 51 No measurement will be made for "Water Control". <br /> I <br /> 52 <br /> I <br /> RIVERFRONT DEVELOPMENT NORTH WETLAND COMPLEX 111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.