My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A-1 Landscaping and Construction, Inc. 7/20/2016
>
Contracts
>
Capital Contract
>
A-1 Landscaping and Construction, Inc. 7/20/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2017 10:01:15 AM
Creation date
7/25/2016 11:25:59 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
A-1 Landscaping and Construction, Inc.
Approval Date
7/20/2016
Council Approval Date
6/22/2016
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Riverfront Development North Wetland Complex
Public Works WO Number
RD-3312
Tracking Number
0000177
Total Compensation
$598,750.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
A-1 Landscaping & Construction, Inc. 6/22/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 2 If the Contractor's total cost for Work with recycled concrete aggregate is greater than <br /> 3 without the Contractor may choose to not use recycled concrete aggregate. When the <br /> 4 Contractor does not meet the minimum requirement of 25 percent recycled concrete <br /> 5 aggregate for the Contract due to costs or any other reason the following shall be <br /> 6 submitted: <br /> 7 <br /> 8 1. A cost estimate for each material listed in Section 9-03.21(1)E that is utilized on ' <br /> 9 the Contract. The cost estimate shall include the following: <br /> 10 <br /> 11 a. The estimated costs for the Work for each material with 25 percent recycled <br /> 12 concrete aggregate. The cost estimate shall include for each material a copy <br /> 13 of the price quote from the supplier with the lowest total cost for the Work. <br /> 14 <br /> 15 b. The estimated costs for the Work for each material without recycled concrete <br /> 16 aggregate. <br /> 17 <br /> 18 The Contractor's cost estimates shall be submitted as an attachment to the Recycled <br /> 19 Materials Reporting form. <br /> 20 <br /> 21 Section 1-07, Legal Relations and Responsibilities to the Public <br /> 22 January 4, 2016 <br /> 23 1-07.1 Laws to be Observed I <br /> 24 In the second to last sentence of the third paragraph, "WSDOT" is revised to read "Contracting <br /> 25 Agency". <br /> 26 <br /> 27 Section 1-08, Prosecution and Progress <br /> 28 January 4, 2016 <br /> 29 1-08.1(1) Prompt Payment, Subcontract Completion and Return of Retainage <br /> 30 Vvithheid <br /> 31 In item number 5 of the first paragraph, "WSDOT" is revised to read "Contracting Agency". <br /> 32 <br /> 33 Section 5-02, Bituminous Surface Treatment <br /> 34 January 4, 2016 <br /> 35 5-02.3(2) Preparation of Roadway Surface <br /> 36 This section is supplemented with the following new subsection: <br /> 37 <br /> 38 5-02.3(2)E Crack Sealing <br /> 39 Where shown in the Plans, seal cracks and joints in the pavement in accordance with <br /> 40 Section 5-04.3(5)C. <br /> 41 <br /> 42 Section 5-04, Hot Mix Asphalt <br /> 43 January 4, 2016 <br /> 44 5-04.2 Materials <br /> 45 The first paragraph is supplemented with the following new items: <br /> 46 <br /> 47 Hot Poured Sealant 9-04.2(1)A <br /> 48 Sand Slurry 9-04.2(1)B <br /> RIVERFRONT DEVELOPMENT NORTH WETLAND COMPLEX 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.