My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A-1 Landscaping and Construction, Inc. 7/20/2016
>
Contracts
>
Capital Contract
>
A-1 Landscaping and Construction, Inc. 7/20/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2017 10:01:15 AM
Creation date
7/25/2016 11:25:59 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
A-1 Landscaping and Construction, Inc.
Approval Date
7/20/2016
Council Approval Date
6/22/2016
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Riverfront Development North Wetland Complex
Public Works WO Number
RD-3312
Tracking Number
0000177
Total Compensation
$598,750.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
A-1 Landscaping & Construction, Inc. 6/22/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 7-03.2 Materials-Catalog Cuts or Standard Plans <br /> 2 7-04 Storm Sewers <br /> 3 7-04.2 Materials-Catalog Cuts or Standard Plans <br /> 4 7-05 Manholes, Inlets, Catch Basins, and Drywells <br /> I 5 7-05.2 Materials-Catalog Cuts or Standard Plans <br /> 6 7-09 Water Mains <br /> 7 7-09.2 Materials-Catalog Cuts or Standard Plans <br /> I 8 7-12 Valves For Water Mains <br /> 9 7-12.2 Materials-Catalog Cuts or Standard Plans <br /> 10 7-14 Hydrants <br /> 11 7-14.2 Materials-Catalog Cuts or Standard Plans <br /> 12 7-15 Service Connections <br /> 13 7-15.2 Materials-Catalog Cuts or Standard Plans <br /> 14 7-17 Sanitary Sewers <br /> I 15 7-17.2 Materials-Catalog Cuts or Standard Plans <br /> 16 <br /> 17 DIVISION 8 MISCELLANEOUS CONSTRUCTION <br /> 18 8-11 Guardrail <br /> 19 8-11.2 Materials-Catalog Cuts or Standard Plans <br /> 20 8-12 Chain Link Fence and Wire Fence <br /> I 21 8-12.2 Materials-Catalog Cuts or Standard Plans <br /> 22 8-13 Monument Cases <br /> 23 8-13.2 Materials-Standard Plans <br /> I <br /> 24 <br /> 25 8-20 Illumination, Traffic Signal Systems, and Electrical <br /> 1. Illumination Items-Shop Drawings <br /> 26 2. Traffic Signal Items-Shop Drawings <br /> I 27 3. Poles, Pedestals, and Foundation Items-Shop Drawings <br /> 28 4. Conduit and Trenching Items-Shop Drawings <br /> 29 8-27 Metal Hand Railings (New Section) <br /> I 30 8-27.1(1) Ornamental Hand Rail-Shop Drawings <br /> 31 8-27.1(2) Pedestrian Hand Rail(Galvanized Steel and Aluminum)-Shop Drawings <br /> 32 Any deviations from Standard Plans will be subject to a Shop Drawing submitted by the <br /> 33 Contractor and approved by the Engineer. Where a Shop Drawing is required by the <br /> I 34 Specifications, any related work performed prior to completion of the Engineer's review <br /> 35 of the pertinent submission will be the sole expense and responsibility of the Contractor. <br /> 36 <br /> 37 1-05.3A Submittals and Requests for Information <br /> 38 <br /> 39 A new section 1-05.3A Submittals and Requests for Information is added as follows: <br /> I 40 <br /> 41 1-05.3A(1) Submittals <br /> 42 Where required by the Contract Documents, the Contractor shall submit information <br /> I 43 which will enable the Owner's Representative to advise the Owner whether the <br /> 44 Contractor's proposed materials, Equipment or methods of work are in general <br /> 45 conformance to the design concept and in compliance with the drawings and <br /> I 46 Specifications, such as catalog cuts and shop, working or detail drawings. Approval or <br /> 47 acceptance of a submittal does not relieve Contractor from complying with contract <br /> 48 requirements. The Owner's approval of a submittal did not constitute a waiver of the <br /> 49 contract requirements. The Owner will not be obligated to accept or pay for work <br /> I50 performed by the Contractor which may be affected by materials, Equipment, or <br /> 51 methods of work not submitted in a timely manner so that final review can be <br /> 52 accomplished before the affected work is complete. The Owner shall not be responsible <br /> 53 for delays, inefficiencies, or any additional costs or expenses caused in whole or in part <br /> iRIVERFRONT DEVELOPMENT NORTH WETLAND COMPLEX 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.