My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 7/25/2016
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 7/25/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 1:45:18 PM
Creation date
7/27/2016 9:27:09 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
7/25/2016
Council Approval Date
7/6/2016
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Puget Sound Outfall PSO 6 Reroute
Public Works WO Number
UP 3583
Tracking Number
0000178
Total Compensation
$820,344.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 3/1/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
412
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT PUBLIC WORKS DOCUMENT 00 72 13 <br /> SPECIAL PROVISIONS GENERAL CONDITIONS <br /> compensation by giving Notice and following the procedures of ARTICLE NOTICE TO <br /> OWNER and ARTICLE CONTRACT CLAIMS within five (5) days of each occurrence. The <br /> Contractor shall not submit a Contract Claim for possession by the Owner of portions of the <br /> Work specifically required in the Contract Documents to be placed into use or operation before <br /> completion of the entirety of the Work. <br /> 5.6 Possession of Incomplete Portions of the Project <br /> A. Should the Contractor fail to meet any date specified for Substantial Completion of Work or any <br /> portion of work requiring early possession and use by the Owner,the Owner may, after a 10-day <br /> notice to the Contractor, take over such portion or any Work that is behind schedule. In such111 <br /> case,the Owner's Representative will prepare a list of incomplete Work taken over by the Owner. <br /> The cost of Owner's work will be charged to and deducted from amounts due to the Contractor. <br /> The Substantial Completion date of the entire or a portion of the Project will be established as the <br /> date when the Owner actually begins using the Project or portion of the Project for its intended <br /> purpose. Division of responsibilities between Owner and Contractor, beginning of warranties, <br /> and any other issues relating to Substantial Completion shall be as specified in 5.7. Substantial <br /> Completion. <br /> 5.7 Substantial Completion <br /> A. When the Contractor considers the Work to be Substantially Complete and ready for its intended <br /> use, it shall give Notice to the Owner's Representative. The Notice shall include an itemized list <br /> of remaining incomplete Work. If the Owner's Representative determine the Work is not <br /> substantially complete, the Contractor will be notified in writing, identifying the reasons for such <br /> a determination. <br /> 1. If the Owner's Representatives find the Work substantially complete, he or she will meet <br /> with the Contractor to: <br /> a. Prepare a Punch List of incomplete items of Work. <br /> b. Define the division of responsibility between Owner and Contractor with respect to <br /> security,operation,maintenance,heat,utilities,insurance, and warranties. <br /> c. Describe any other issues related to acceptance of the substantially completed Work. <br /> B. If the Owner's Representative is not an employee of the Owner, the Owner's Representative will <br /> write to the Owner upon reaching agreement with the Contractor, certifying that the Work is <br /> substantially complete, listing the items of incomplete Work, stating the date for completion of <br /> incomplete Work, defining the division of responsibilities, and setting forth any other terms <br /> related to acceptance. In such event, the Owner will review the Owner's Representative's <br /> certification that the Work is substantially complete. If the Owner concurs,the Owner will notify <br /> the Contractor in writing that the Work is accepted as substantially complete. Except for any <br /> portion(s) of Work specified for early completion or required by the Owner for early possession, <br /> Substantial Completion will not occur for any Work until the entire Project is ready for <br /> possession and use. The acceptance notice will include a Punch List of incomplete Work items <br /> and corrective Work, set the date for their completion and repair, describe the division of <br /> responsibility between the Owner and Contractor, and describe any other terms of acceptance. <br /> The Contractor will acknowledge receipt of the acceptance notice in writing, indicating <br /> acceptance of all of its terms and provisions. <br /> PSO6 REROUTE 007213 -28 <br /> WO NO.—UP3583 MAY 2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.