My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 7/25/2016
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 7/25/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 1:45:18 PM
Creation date
7/27/2016 9:27:09 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
7/25/2016
Council Approval Date
7/6/2016
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Puget Sound Outfall PSO 6 Reroute
Public Works WO Number
UP 3583
Tracking Number
0000178
Total Compensation
$820,344.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 3/1/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
412
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT PUBLIC WORKS DOCUMENT 00 72 13 1 <br /> SPECIAL PROVISIONS GENERAL CONDITIONS <br /> Representative such supporting information, including bidding or layout documents, as may I <br /> reasonably be necessary for the Owner's Representative to determine whether the Contract <br /> Sum is increased,decreased or unchanged by the Change Order. <br /> C. Utilities I <br /> 1. General <br /> a. The Owner has endeavored to determine the existence of utilities at the Site of the <br /> Work from the records of the owners of known utilities in the vicinity of the Work. The <br /> positions of these utilities as derived from such records are shown on the Drawings. No <br /> excavations were made to verify the locations shown for underground utilities. The <br /> service connections to these utilities are not shown on the Drawings. It shall be the <br /> responsibility of the Contractor to determine the exact location of utilities and service <br /> connections thereto. Such field verification must be performed in sufficient time so as <br /> not to impede the progress of the Work or fabrication of materials to be incorporated <br /> into the Work. The Contractor shall call the Utility Location Request Center (one call <br /> center) for location of utilities in the field not less than two (2) nor more than (10) ten <br /> business days before the scheduled date of commencement of excavation. The <br /> Contractor shall make its own investigations, including exploratory excavations, to <br /> determine the locations and type of existing utilities, including service connections, <br /> prior to commencing work that could result in damage to such utilities. The Contractor <br /> shall immediately notify the Owner's Representative as to any utility discovered by him <br /> in a different position than shown on the Drawings or which is not shown on the <br /> Drawings. No excavation shall begin until all known facilities in the excavation areas <br /> have been marked. Contractor shall coordinate its activities with the utility provider. <br /> Contractor shall bear the cost of maintaining utility service. <br /> b. The Contractor should be aware of, and comply with, Chapter 19.122 RCW, a law <br /> relating to underground utilities. The Owner shall not pay Contractor any of <br /> Contractor's cost of complying with this law, and repairing or indemnifying any <br /> damage or injury arising out of Contractor's failure to comply with this law. <br /> c. Owner does not represent or warrant who may be obligated to pay for the cost of <br /> relocation or temporary maintenance of the utility. Contractor shall investigate whether <br /> such cost must be borne by the owner of the utility. <br /> d. Governmental agencies and owners of utilities reserve the right to enter upon streets, <br /> alleys, rights-of-way, or easements for the purpose of making changes in their property <br /> made necessary by the Work and for the purpose of maintaining and making repairs to <br /> their property. <br /> 2. Known Utilities �" I <br /> a. The Contractor shall provide at its sole expense all labor, equipment, materials and <br /> services necessary to remove, relocate, or maintain utilities specified on the Drawings. <br /> The work on each utility shall be performed in a manner satisfactory to the utility <br /> owner. The utility owner has the option of doing such work with its own forces at the <br /> Contractor's expense,or permitting the work to be performed by the Contractor. <br /> 3. Service Connections <br /> a. Locations of service connections are not identified on the Drawings. The Contractor <br /> shall provide at its sole expense all labor, equipment and material to remove,relocate or <br /> maintain service connections. Work on service connections shall be performed in a <br /> manner satisfactory to the service connection owner. The service connection owner has <br /> PSO6 REROUTE 007213 - 12 <br /> WO NO.—UP3583 MAY 2016 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.