My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Otak, Inc 8/15/2016
>
Contracts
>
6 Years Then Destroy
>
2018
>
Otak, Inc 8/15/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2016 11:35:52 AM
Creation date
8/23/2016 11:35:35 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Otak, Inc
Approval Date
8/15/2016
Council Approval Date
8/3/2016
End Date
12/31/2018
Department
Public Works
Department Project Manager
Halley Kimball
Subject / Project Title
Dike Repair Design Diking District No. 5
Tracking Number
0000245
Total Compensation
$240,000.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br /> Continued <br /> fish and wildlife habitat conservation areas will be collected. Ordinary high water marks (OHWM) <br /> will be determined per both Ecology and the Army Corps methodologies along Union Slough and <br /> associated ditches in the project area of potential impact.The OHWM will be flagged and surveyed <br /> to incorporate in the project base map. <br /> Data sheets and photographs documenting the wetland and stream field work will be compiled and <br /> included in the Critical Area Study report.Wetlands will be rated according to the 2014 Ecology <br /> Washington State Wetland Rating System for Western Washington methodology and the City and County's <br /> rating requirements. Streams will be rated per Washington Department of Natural Resources <br /> criteria. Buffer widths for wetlands and streams will be established per City and County Critical <br /> Areas Ordinances. <br /> Assumptions: <br /> • Wetland delineations and stream/ditch characterizations will be conducted from the surface <br /> water line of the Snohomish River (induding wetland areas along the waterward side of the <br /> dike),and extending laterally for 50 feet from the landward toe of the dike in the project area of <br /> potential impact.Any critical areas beyond 50 feet will be estimated and noted in the report. <br /> • The City will notify private property owners of scheduled field work and gain right-of-entry as <br /> necessary. <br /> • Wetland flags will be located with a resource-grade GPS unit with sub-meter accuracy,and <br /> OHWM flags along Union Slough will be located with survey-grade equipment. <br /> • Geotechnical data/information on geologically hazardous areas will be collected under Task 3.1. <br /> • Data on groundwater and/or critical aquifer recharge areas will be collected under Task 3.1. <br /> Task 4.2 Prepare Environmental Baseline Documentation <br /> A Critical Areas Study (CAS) will be prepared for wetlands, streams,and other fish and wildlife <br /> habitat conservation areas.The CAS will indude all information required for compliance with both <br /> the City of Everett Critical Areas Ordinances and Snohomish County Critical Areas Regulations, <br /> induding:Wetland Determination Data Forms,Wetland Rating Forms (and figures),photographs, <br /> and supporting figures.The CAS will incorporate any relevant background information and previous <br /> studies completed for the project area as provided by the City. <br /> Assumptions: <br /> • City will provide copies of previously completed environmental documentation for the project <br /> area,if available. <br /> • City will provide comments on the Draft CAS during one round of review prior to Otak <br /> completing the Final CAS. <br /> DD5 Dike Repairs and Improvements Project 9 <br /> otak <br /> K\project\32700\32758\Contract\Scope for Phase 1—DD5 rlikr repairs final 7-22.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.