Laserfiche WebLink
POLICE HQ—MASONRY CLEANIG AND REPAIR APRIL 15,2016 <br /> 1.03 MATERIAL DELIVERY AND STORAGE <br /> A. Delivery of materials shall be made only during the Contractor's working hours and at <br /> such times as they have a representative available. <br /> B. The Contractor shall store materials within the work site area at an area determined in <br /> pre-construction conference or designated by the Owner. <br /> PART 2 -PRODUCTS <br /> NOT USED ' <br /> PART 3 -EXECUTION ' <br /> NOT USED <br /> END OF SECTION <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> TEMPORARY FACILITIES AND CONTROLS 01 5000-2 <br /> 1 <br />