My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Alpine Waterproofing 8/23/2016
>
Contracts
>
Capital Contract
>
Alpine Waterproofing 8/23/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2017 10:34:45 AM
Creation date
8/29/2016 10:26:08 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Alpine Waterproofing
Approval Date
8/23/2016
Council Approval Date
7/6/2016
Department
Facilities
Department Project Manager
Scott Pattison
Subject / Project Title
Police Headquarters Masonry Cleaning
Tracking Number
0000250
Total Compensation
$515,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Alpine Waterproofing & Masonry Restoration 11/16/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Alpine Waterproofing & Masonry Restoration 8/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> POLICE HQ—MASONRY CLEANING AND REPAIR APRIL 15,2016 <br /> I <br /> SECTION 00 2113—INSTRUCTIONS TO BIDDERS <br /> 1.1 General Description and Location of Project <br /> A. The Work to be performed will include furnishing all labor, materials and equipment <br /> necessary to perform all Work as required by the Contract in accordance with the Contract <br /> Documents. <br /> B. The Project Site is located at 3002 Wetmore Avenue, Everett, WA <br /> I <br /> 1.2 Project Manager <br /> Questions and inquiries about the Contract Documents should be directed to the attention of <br /> Scott Pattison, City of Everett Facilities Manager at(425) 257-8846 or email at <br /> sattison@everettwa.gov. <br /> 1.3 Standard Specifications <br /> The following other Specifications and Standard Plans shall apply to the extent to which they are <br /> called out in the Contract Documents. <br /> 1. WSDOT"2012 Standard Specifications for Road, Bridge and Municipal Construction", <br /> as amended by the APWA Supplements,hereinafter referred to as the"Standard <br /> Specifications." <br /> 2. City of Everett"Design and Construction Standards and Specifications" (Revised 1-08), <br /> as found online on the City's Website at: <br /> http://www.ci.everett.wa.us/GetDoc.aspx?DocID=273 <br /> 3. "Standard Plans for Road and Bridge Construction,"latest edition as prepared by <br /> WSDOT. <br /> 4. "Manual on Uniform Traffic Control Devices" (MUTCD), latest edition. <br /> 5. APWA Standards, latest edition. <br /> 6. AWWA Standards, latest edition. <br /> 7. American Concrete Institute (ACI), latest edition <br /> ' 1.4 Examination of Site Conditions,Contract Documents and Regulations <br /> A. Bidders shall inspect the Site of the Work and carefully review the Contract Documents to <br /> satisfy themselves,by personal examination, physical testing, or by such other means as they <br /> may prefer, of the location of the proposed Work, the actual physical conditions of and at the <br /> Site, surface and subsurface conditions, and conditions ordinarily to be encountered and <br /> generally recognized as inherent in the Work. If, during the course or as a result of such <br /> inspection, examination and testing, a Bidder finds facts or conditions that appear to conflict <br /> or are omitted from the Contract Documents, or with other data or material made available <br /> relating to the Work, Bidder shall so notify the City in writing, and may apply to the City for <br /> additional information and explanation before submitting their Bid. <br /> B. The submission of a Bid by the Bidder shall constitute acknowledgment that, in preparing <br /> and submitting a Bid, Bidder has not only reviewed the Contract Documents, but is also <br /> relying on their own knowledge, examination, inspection, and testing of: <br /> 1. the Site of the Work, <br /> INSTRUCTIONS TO BIDDERS 00 2113 - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.