Laserfiche WebLink
other such measures to protect the structural integrity of the Structure such that there can be <br /> continuous safe passage of trains until repairs are made. <br /> BRIDGE ALTERATIONS: <br /> Except as provided otherwise by this Agreement, there will be no alterations made to the <br /> Structure that will alter the railroad vertical or horizontal clearances provided by the original <br /> design. Pipelines will be not be added or attached to the Structure without first submitting plans <br /> and calculations to BNSF for review and approval. <br /> 59 of 60 <br />