Laserfiche WebLink
, • • <br />22. On the foundation plan show ventilation, furnace, water heater, existing posts & beams, <br />new footing and/or framing members supporting new point loads. Show stairs and brick <br />walis. <br />23. Define heated envelope if applicable in basement. Show duct insulation requirements for <br />ducts located in unheated spaces. <br />24. Specify insulation requirements for water heater in unheated space. <br />25. Add gas piping to permit application for all gas appliances (this will be the quantity of <br />fixtures with gas). <br />26. Update code references to current codes. This dwelling will be reviewed under the 2009 <br />International Residential Code. <br />27. Please be advised that there are no permits issued for this properry. Any work being <br />done at this location is in violation of the International Residential Code section R105 <br />and is subject to a fee in addition to the required permit fees. (per section R108.6 IRC). <br />Please prepare a response letter showing where each item in this correction letter is <br />addressed on the plan set. <br />Upon resubmittal of the drawings, your application will be given priority and plan review will <br />recommence. <br />All required submittals shall be of sufficient detail and contain sufficient information to ensure <br />that the proposed structure will be constructed in compliance with all adopted codes. <br />Sincerely, <br />,,"2,�"���T�. ..__. -� - <br />JefF Heilman <br />Development Technician <br />425-257-8976 <br />Email: �heilmanCc�ci.everett.wa.us <br />3�� <br />