My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corp 9/27/2016
>
Contracts
>
Capital Contract
>
Faber Construction Corp 9/27/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 11:58:56 AM
Creation date
10/13/2016 11:42:20 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corp
Approval Date
9/27/2016
Council Approval Date
8/17/2016
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Q Broadway
Public Works WO Number
UP 3612
Tracking Number
0000297
Total Compensation
$721,228.06
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Faber Construction Corporation 4/11/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Faber Construction Corporation 5/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> and compaction; pavement, concrete driveway and concrete sidewalk removal; removing <br /> existing meter box and setter, and reconnecting to existing private water service. <br /> Unit contract price shall include all coordination efforts with the City regarding removing <br /> existing meter and resetting meter in new meter box. <br /> Bid Item 36 - Crushed Surfacing Top Course I <br /> Measurement and Payment: Unit Price per Ton (TON) <br /> Measurement for crushed surfacing top course will be by the ton as recorded on certified <br /> weight tickets in accordance with 1-09.2 WEIGHING EQUIPMENT and limited to <br /> dimensions defined in the Work, descriptions for other bid items, shown on the Plans, <br /> details or COE Standard Drawings or as otherwise approved by the Engineer. Crushed <br /> Surfacing Top Course material placed exceeding "neatline" quantities without advance <br /> 111 <br /> authorization by the Inspector will not be paid for. <br /> The unit price per ton shall be full compensation for all labor, compaction, material, tools, <br /> and equipment necessary to furnish, haul, stockpile, place, grade, and compact imported <br /> crushed surfacing top course for the Work as required, from a Contractor supplied source in <br /> accordance with the Standard Specifications and these Special Provisions. <br /> The unit price for crushed surfacing top course also includes all costs for controlling <br /> moisture content. <br /> Also included in this bid item shall be the cost of all equipment required to remove existing <br /> soils to attain proper elevations, compaction of native subgrade soils, as well as to <br /> uniformly spread and compact the crushed surfacing material. <br /> The unit price for this bid item includes all costs for removing, loading and disposing of <br /> displaced unsuitable material, including haul. <br /> Include in this bid item the cost of sprinkling during dry periods prior to placement of the <br /> crushed surfacing and while spreading and compacting the material. <br /> Payment for crushed surfacing top course will be by the ton of material placed and <br /> approved by the Inspector. <br /> Bid Item 37 - Cement Concrete Pavement Base Type III (H.E.S.) for Trench Patch <br /> Measurement and Payment: Unit Price per Square Yard (SY) I <br /> Measurement for Cement Concrete Pavement, Type III (H.E.S.) shall be per square yard as <br /> delineated by the Contractor and approved by the Inspector prior to removal. <br /> The unit price per square yard for Cement Concrete Pavement Base, Type III (H.E.S), shall <br /> be full compensation for all materials, tools, labor and equipment necessary to complete <br /> the Work in accordance with the Plans, Section 5 of the Standard Specifications and 5- <br /> 06.3(2) and 5-06.3(3) of these Special Provisions. <br /> Bid Item 38 - HMA, CL 1/2" PG 64-22 for Permanent Trench Patch <br /> Measurement and Payment: Unit Price per Ton (TON) <br /> Measurement for HMA, CL 1/2" PG 64-22 shall be by the ton, recorded on certified weight <br /> tickets in accordance with 1-09.2 WEIGHING EQUIPMENT for HMA placed within the limits <br /> of dimensions defined in the Work or shown on the Plans, Standard Specifications, Section <br /> 5-06 of these Special Provisions, or as otherwise approved by the Engineer. The <br /> measurement and payment limits for measuring the width of this bid item shall not exceed <br /> the saw-cut limits shown on the Drawings. No deduction will be made for the weight of <br /> asphalt binder, blending sand, mineral filler, or other component of the mixture. 1 <br /> Water Main Replacement"Q" Division B—BID DESCRIPTIONS July 8, 2016 <br /> -Broadway <br /> WO No.—UP3612 SP -12 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.