My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corp 9/27/2016
>
Contracts
>
Capital Contract
>
Faber Construction Corp 9/27/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 11:58:56 AM
Creation date
10/13/2016 11:42:20 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corp
Approval Date
9/27/2016
Council Approval Date
8/17/2016
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Q Broadway
Public Works WO Number
UP 3612
Tracking Number
0000297
Total Compensation
$721,228.06
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Faber Construction Corporation 4/11/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Faber Construction Corporation 5/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> The Contractor may at his option use sod brought in from an outside source in lieu <br /> ' of replacing existing sod. If the Contractor elects to use sod from an outside <br /> source, the Engineer shall approve the supply source. <br /> The sod shall be removed to a uniform depth of approximately 2-inches with an <br /> ' approved type of sod cutter. This operation shall be performed in such a manner <br /> as to ensure uniform thickness of sod throughout the operation. <br /> Where sod is to be replaced with new sod, provide new sod in accordance with 9- <br /> ' 14.6(8) of these Special Provisions and the Standard Specifications. <br /> Guarantee sod to survive in a healthy condition through the 90 day establishment <br /> period. The establishment period shall begin on the date the Engineer accepts <br /> ' the sod placement. Remove and replace, at Contractor's expense, sod that in the <br /> opinion of the Engineer is not in a healthy growing condition at the end of the <br /> establishment period. Provide replacement sod that is of the same mixture and <br /> grade as the surviving sod. <br /> 8-02.4 Measurement <br /> Delete all paragraphs in 8-02.4 and substitute the following: <br /> ' Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B - Bid Item Descriptions and Section 1-09 MEASUREMENT <br /> AND PAYMENT of the Standard Specifications. <br /> ' 8-02.5 Payment <br /> Delete all paragraphs in 8-02.5 and substitute the following: <br /> Payment for Bid items of Work completed pursuant to the Contract Documents will be <br /> ' as described in Division B - Bid Item Descriptions and Section 1-09 MEASUREMENT <br /> AND PAYMENT of the Standard Specifications. <br /> 8-04 CURBS, GUTTERS AND SPILLWAYS <br /> 8-04.1 Description <br /> Revise the first paragraph in 8-04.1 to read as follows: <br /> This work shall consist of construction of cement concrete curbs. curbs and gutters, <br /> and gutters in accordance with 8-04 of the Standard Specifications and as modified in <br /> these Special Provisions conforming to the Plans and COE Standard Drawings. <br /> ' 8-04.2 Materials <br /> Supplement 8-04.2 by adding the following: <br /> Liquid Membrane-Forming Concrete 9-23.2 Special Provisions <br /> ' Curing Compounds <br /> Chemical Admixtures for Concrete 9-23.6 Special Provisions <br /> 8-04.3 Construction Requirements <br /> ' 8-04.3(1) Cement Concrete Curbs, Gutters, and Spillways <br /> Supplement 8-04.3(1) by adding the following: <br /> Provide steel forms on tangent sections and wooden forms for curved sections <br /> ' and radii. <br /> Provide 1/2-inch premolded filler in lieu of 3/8-inch premolded filler for through- <br /> expansion Provide through expansion joint at maximum 30-foot intervals. <br /> ' Provide through expansion joint at each end of driveway. <br /> Compact the subbase for curb and gutter sections to 95-percent maximum density <br /> at optimum moisture content before placing the curb and gutter. <br /> Water Main Replacement"Q" Division 8-MISC CONSTRUCTION July 8, 2016 <br /> -Broadway <br /> WO No.-UP3612 SF' -165 <br />
The URL can be used to link to this page
Your browser does not support the video tag.