Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> The Contractor may at his option use sod brought in from an outside source in lieu <br /> ' of replacing existing sod. If the Contractor elects to use sod from an outside <br /> source, the Engineer shall approve the supply source. <br /> The sod shall be removed to a uniform depth of approximately 2-inches with an <br /> ' approved type of sod cutter. This operation shall be performed in such a manner <br /> as to ensure uniform thickness of sod throughout the operation. <br /> Where sod is to be replaced with new sod, provide new sod in accordance with 9- <br /> ' 14.6(8) of these Special Provisions and the Standard Specifications. <br /> Guarantee sod to survive in a healthy condition through the 90 day establishment <br /> period. The establishment period shall begin on the date the Engineer accepts <br /> ' the sod placement. Remove and replace, at Contractor's expense, sod that in the <br /> opinion of the Engineer is not in a healthy growing condition at the end of the <br /> establishment period. Provide replacement sod that is of the same mixture and <br /> grade as the surviving sod. <br /> 8-02.4 Measurement <br /> Delete all paragraphs in 8-02.4 and substitute the following: <br /> ' Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B - Bid Item Descriptions and Section 1-09 MEASUREMENT <br /> AND PAYMENT of the Standard Specifications. <br /> ' 8-02.5 Payment <br /> Delete all paragraphs in 8-02.5 and substitute the following: <br /> Payment for Bid items of Work completed pursuant to the Contract Documents will be <br /> ' as described in Division B - Bid Item Descriptions and Section 1-09 MEASUREMENT <br /> AND PAYMENT of the Standard Specifications. <br /> 8-04 CURBS, GUTTERS AND SPILLWAYS <br /> 8-04.1 Description <br /> Revise the first paragraph in 8-04.1 to read as follows: <br /> This work shall consist of construction of cement concrete curbs. curbs and gutters, <br /> and gutters in accordance with 8-04 of the Standard Specifications and as modified in <br /> these Special Provisions conforming to the Plans and COE Standard Drawings. <br /> ' 8-04.2 Materials <br /> Supplement 8-04.2 by adding the following: <br /> Liquid Membrane-Forming Concrete 9-23.2 Special Provisions <br /> ' Curing Compounds <br /> Chemical Admixtures for Concrete 9-23.6 Special Provisions <br /> 8-04.3 Construction Requirements <br /> ' 8-04.3(1) Cement Concrete Curbs, Gutters, and Spillways <br /> Supplement 8-04.3(1) by adding the following: <br /> Provide steel forms on tangent sections and wooden forms for curved sections <br /> ' and radii. <br /> Provide 1/2-inch premolded filler in lieu of 3/8-inch premolded filler for through- <br /> expansion Provide through expansion joint at maximum 30-foot intervals. <br /> ' Provide through expansion joint at each end of driveway. <br /> Compact the subbase for curb and gutter sections to 95-percent maximum density <br /> at optimum moisture content before placing the curb and gutter. <br /> Water Main Replacement"Q" Division 8-MISC CONSTRUCTION July 8, 2016 <br /> -Broadway <br /> WO No.-UP3612 SF' -165 <br />