My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BHC Consultants LLC Amendment 1
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
BHC Consultants LLC Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2016 10:48:46 AM
Creation date
10/19/2016 10:48:37 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
BHC Consultants LLC
Approval Date
10/4/2016
Council Approval Date
9/28/2016
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer Regulator 4 and 39 modifications
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Total Compensation
$356,897.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b. Attend up to four project meetings with BHC Consultants and the City of <br /> Everett at kickoff, 30-, 90-, and 100-percent design stages. <br /> c. Conduct an internal quality assurance program prior to major submittals. <br /> 2. Utility Coordination <br /> a. Identify potential utility conflicts associated with roadway restoration. <br /> Coordinate with utility franchises to resolve conflicts. <br /> 3. WSDOT Coordination <br /> a. Coordinate with WSDOT for approval of traffic control plans associated <br /> with a lane closure on the southbound I-5 off-ramp at Everett Avenue. <br /> 4. 60 Percent Design <br /> a. Develop preliminary layout of new curb ramps and curb returns for City <br /> review and concurrence prior to completing 60 percent plans. <br /> b. Prepare 60 percent plans consisting of the following: <br /> • Alignment and Survey Control(2 sheets) <br /> • Typical Roadway Sections (1 sheet) <br /> • TESC and Site Preparation Plan(2 sheets) <br /> • Paving Plans and Details(5 sheets) <br /> c. Prepare 60 percent special provisions related to roadway restoration plans <br /> in WSDOT format. The special provisions will address items of work <br /> which are not addressed by the APWA and WSDOT Standard <br /> Specifications. <br /> d. Prepare 60 percent Opinion of Probable Construction Cost related to <br /> roadway restoration plans. <br /> e. Respond to review comments provided by the City. <br /> Deliverables: <br /> • Preliminary layout in PDF format(half size) and five hard copies(full- <br /> size) <br /> BHC Consultants Scope of Services <br /> Everett R4&R39 Regulator Mods-Roadway Restoration&Surveying 3 of 8 <br /> September 9,2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.