Laserfiche WebLink
• 60 percent plans in PDF format(half-size)and five hard copies (full- <br /> size) <br /> • 60 percent special provisions in WORD format <br /> • 60 percent Opinion of Probable Construction Cost in PDF and Excel <br /> format <br /> 5. 90 Percent Design <br /> a. Prepare 90 percent plans consisting of the following: <br /> • Alignment and Survey Control (2 sheets) <br /> • Typical Roadway Sections (1 sheet) <br /> • TESC and Site Preparation Plan(2 sheets) <br /> • Paving Plans and Details(5 sheets) <br /> • Traffic Control Plans (3 sheets) <br /> b. Prepare 90 percent special provisions related to roadway restoration plans <br /> in WSDOT format. <br /> c. Prepare 90 percent Opinion of Probable Construction Cost related to <br /> roadway restoration plans. <br /> d. Respond to review comments provided by the City. <br /> Deliverables: <br /> • 90 percent plans in PDF format(half- size)and five hard copies(full- <br /> size) <br /> • 90 percent special provisions in WORD format <br /> • 90 percent Opinion of Probable Construction Cost in PDF and Excel <br /> format <br /> 6. Final PS&E <br /> a. Finalize plans, special provisions and Opinion of Probable Construction <br /> Cost with minor revisions in response to the City's comments. <br /> Deliverables: <br /> • Final signed plans (full size hardcopy) <br /> • Final special provisions in WORD format <br /> BHC Consultants Scope of Services <br /> Everett R4&R39 Regulator Mods-Roadway Restoration&Surveying 4 of 8 <br /> September 9,2016 <br />