construction work areas manually or by using mechanical sweepers, as needed, to minimize <br /> tracking of sediments on vehicle tires away from the site and to minimize wash off of sediments <br /> from adjacent streets in runoff. <br /> A Chitosan enhanced sand filtration system will be installed and used for the duration of the <br /> project. This stormwater treatment plan has been prepared by Clear Water Compliance and <br /> approved by the Washington State Department of Ecology. A primary objective of the CESF <br /> system is to treat the water that has been contaminated in accordance with the Administrative <br /> Order issued by the Washington State Department of Ecology. The location of the system is <br /> subject to change. Currently it is scheduled to be located at the south end of the project, or at <br /> the adjacent parking lot. If the system moves the SWPPP and the temporary erosion and <br /> sedimentation control (TESC) plan will be updated. <br /> Check dams will be placed around the perimeter of the site in the existing ditches to slow down <br /> any runoff from the parking lot and adjacent streets. The interceptor dike and swale will be <br /> constructed around the perimeter of the spoil pile to contain water and directed it to the <br /> temporary sediment pond and baker tanks. <br /> Installation Schedules: <br /> The silt fence will be installed at the very beginning of the project to protect the jurisdictional <br /> ditch and pond at the south west corner of the site. The straw wattle and check dams will be <br /> installed at the beginning of the project. The chemical treatment system will be installed at the <br /> beginning of the project. <br /> Inspection and Maintenance plan: <br /> The BMPs, such as, silt fence and check dams, will be inspected, maintained, and repaired as <br /> needed to make sure it is working properly and has not been damaged. The BMPs will be <br /> checked within 24 hours of a rain event. <br /> Responsible Staff: <br /> Steve Roetemeyer with MiclMountain Contractors will be the onsite CESCL to maintain. <br /> 1 14 <br />