Laserfiche WebLink
2.1.5 Element 5: Stabilize Soils <br /> Describe how you will stabilize exposed and unworked soils throughout the life of the project <br /> (i.e., temporary and permanent seeding, mulching, erosion control fabrics, etc.). <br /> Describe how you will stabilize soil stockpiles. <br /> Describe how you will minimize the amount of soil exposed throughout the life of the project. <br /> Describe how you will minimize the disturbance of steep slopes. <br /> Describe how you will minimize soil compaction. <br /> Describe how you will stabilize contaminated soil and contaminated soil stockpiles if applicable. <br /> Exposed and unworked soils will be stabilized according to the time period set forth for dry and <br /> wet seasons, on the west or east sides of the crest of the Cascade Mountains. <br /> Select your region's table and delete the others. <br /> West of the Cascade Mountains Crest <br /> Season Dates Number of Days Soils Can <br /> be Left Exposed <br /> During the Dry Season May 1 — September 30 7 days <br /> During the Wet Season October 1 —April 30 2 days <br /> Soils must be stabilized at the end of the shift before a holiday or weekend if needed based on <br /> the weather forecast. <br /> Anticipated project dates: Start date: 5/22/2015 End date: 1/1/2016 <br /> Will you construct during the wet season? <br /> ® Yes❑ No <br /> List and describe BMPs: <br /> Exposed and unworked soils shall be stabilized with the application of effective BMPs to prevent <br /> erosion throughout the life of the project. The specific BMPs for soil stabilization to be used on <br /> this project include: <br /> • Plastic Covering (BMP C123) <br /> 15 <br />