Laserfiche WebLink
• <br />Connections <br />C CONCRETE COLUMNS: All concrete columns shall be doweled into the foundation for Life Safety <br />and the dowels shall be able to develop the tensile capacity of the column for Immediate Occupancy. <br />(Tier 2: Sec. 4.6.3.2) <br />Concrete colunins are dotiveled irlto the.foundation as per schedule on original drativings <br />provided to a�s. No details or sections are providetl. <br />ASCE 31-03 Seismic Evaluation of Existing Buildings Basic Structural Checklist for C1 <br />