My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Marshbank Construction 5/9/2016
>
Contracts
>
Capital Contract
>
Marshbank Construction 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:23:23 AM
Creation date
5/20/2016 10:28:35 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Marshbank Construction
Approval Date
5/9/2016
Council Approval Date
4/16/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
41st St to W Marine View Dr Corridor Imprvts
Public Works WO Number
PW 3472
Tracking Number
0000049
Total Compensation
$2,758,753.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Marshbank Construction 1/25/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
MARSHBANK CONSTRUCTION 3/26/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Marshbank Construction 6/26/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> 1 sealing, the splice closure, the Contractor shall show that the closure maintains <br /> 2 10psi of pressure for a 24-hour period. <br /> 3 <br /> 4 Video, Voice, & Data Distribution And Transmission Systems <br /> 5 Section 9-29.3 is supplemented with the following: <br /> 6 <br /> 7 If any equipment specified in this section has been superseded by a newer product that <br /> 8 is interchangeable, the newer product shall be supplied. If the product is no longer <br /> 9 available and has no replacement, the Contractor shall propose a different product <br /> 10 meeting the same performance and material specifications as the discontinued one. <br /> 11 <br /> 12 Conductors, Cable I <br /> 13 Section 9-29.3 is supplemented with the following: <br /> 14 <br /> 15 <br /> 16 Twisted Pair(TWP) Copper Cable <br /> 17 Section 9-29.3(2) is supplemented with the following: <br /> 18 <br /> 19 Outdoor Rated Category 6 Cable <br /> 20 A Category 6 outside plant rated cable shall be provided for connecting <br /> 21 Ethernet devices that are in separate cabinets. The cable shall contain four <br /> 22 twisted pairs of #23 or 24AWG solid bare copper wire. Each pair shall be <br /> 23 uniquely color coded with a Thermoplastic polyolefin jacket. <br /> 24 <br /> 25 The cable outer jacket shall be Polyolefin with a minimum wall thickness of <br /> 26 0.040". The cable shall consist of water blocking material in the cable <br /> 27 interstices for moisture protection. <br /> 28 <br /> 29 The cable shall have a voltage rating of 300V. <br /> 30 <br /> 31 The cable shall be UL listed. It shall support up to IEEE 802.3 1000Base-T <br /> 32 Ethernet and IEEE 802.3af for power over Ethernet. <br /> 33 <br /> 34 The cable shall be terminated on each end with an RJ45 connector. <br /> 35 <br /> 36 Location Wire and Warning Tape <br /> 37 Warning Tape <br /> 38 Warning tape shall be installed in continuous sections for all underground fiber <br /> 39 optic conduit installation where trenching is required. The warning tape shall <br /> 40 be installed approximately 6 inches below the surface of pavement or existing <br /> 41 grade. Warning tape shall be installed a minimum of 12 inches into all cable <br /> 42 vaults and pull boxes at both ends of the trench. <br /> 43 <br /> 44 Location Wire <br /> 45 Wire conductor shall be installed in continuous sections for all underground <br /> 46 fiber optic conduit installation where trenching is required. A minimum of 6 feet <br /> 47 of location wire shall be extended into each cable vault or pull box. The locate <br /> 48 wire shall be attached to the "C" channel or the cover hinge bracket with <br /> 49 stainless steel bolts and straps. A 1-foot loop of locate wire shall be provided <br /> 50 above the channel as shown in the Plans. Locator wire shall be placed <br /> 41st STREET TO WMVD FREIGHT <br /> CORRIDOR IMPROVEMENTS <br /> FED AID#STPUL-9931(012);PW#3472 SP-104 February 10,2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.