Laserfiche WebLink
I <br /> I <br /> 1 Maintenance and Operations Manual(s) <br /> 2 Two Maintenance and Operations Manuals shall be provided for each UPS cabinet. III3 <br /> 4 <br /> 5 <br /> 7 (******) <br /> 8 Equipment List and Drawings I <br /> 9 Section 9-29.6 is supplemented with the following: <br /> 10 I 11 A) Shop Drawings for Traffic Signal and Luminaire Poles: Within 20 days <br /> 12 following execution of the contract, or approval of electrical subcontractor, <br /> 13 the contractor shall submit shop drawings for the traffic signal and luminaire <br /> 14 poles to be used on the project. Within 20 days following approval of the <br /> 15 shop drawings, the contractor shall submit a letter to the engineer certifying <br /> 16 that the poles have been ordered and certifying the manufacturer's planned <br /> 17 delivery date. <br /> I <br /> 18 <br /> 19 B) Equipment Submittal for Traffic Signal Equipment: Within 20 days following <br /> 20 execution of the contract, the contractor shall submit 3 copies of complete <br /> 21 catalog data for the following items: <br /> 22 <br /> 23 Load Switches I 24 Conflict Monitor <br /> 25 Detector Amplifiers <br /> 26 Preemption Equipment <br /> 27 Loop Sealant111 <br /> 28 Vehicle & Pedestrian Signal Heads & Hardware <br /> 29 Service Cabinets <br /> I <br /> 30 Terminal Cabinets <br /> 31 Signal Controllers and Software <br /> 32 Video Detection Systems <br /> 33 Fiber Distribution Units I 34 Fiber Switches <br /> 35 <br /> 36 The equipment shall be approved by the engineer in writing prior to the actual <br /> I <br /> 37 ordering of the equipment. <br /> 38 <br /> 39 <br /> 40 <br /> 41 GAN 8'- __26:(; (24't,:: All` t <br /> 42 Section 8-20.2(2) is new with the following: <br /> 43 <br /> 44 (******) <br /> 45 Television Cameras I <br /> 46 Television cameras shall be supplied as a unit including camera with integrated <br /> 47 lens, id generator, camera controller, pressurized environmental ensclosure, pan <br /> I <br /> 4151 STREET TO WMVD FREIGHT <br /> CORRIDOR IMPROVEMENTS 111 <br /> FED AID#STPUL-9931(012); PW#3472 SP-138 February 10,2016 <br />