My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Marshbank Construction 5/9/2016
>
Contracts
>
Capital Contract
>
Marshbank Construction 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:23:23 AM
Creation date
5/20/2016 10:28:35 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Marshbank Construction
Approval Date
5/9/2016
Council Approval Date
4/16/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
41st St to W Marine View Dr Corridor Imprvts
Public Works WO Number
PW 3472
Tracking Number
0000049
Total Compensation
$2,758,753.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Marshbank Construction 1/25/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
MARSHBANK CONSTRUCTION 3/26/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Marshbank Construction 6/26/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> 1 Maintenance and Operations Manual(s) <br /> 2 Two Maintenance and Operations Manuals shall be provided for each UPS cabinet. III3 <br /> 4 <br /> 5 <br /> 7 (******) <br /> 8 Equipment List and Drawings I <br /> 9 Section 9-29.6 is supplemented with the following: <br /> 10 I 11 A) Shop Drawings for Traffic Signal and Luminaire Poles: Within 20 days <br /> 12 following execution of the contract, or approval of electrical subcontractor, <br /> 13 the contractor shall submit shop drawings for the traffic signal and luminaire <br /> 14 poles to be used on the project. Within 20 days following approval of the <br /> 15 shop drawings, the contractor shall submit a letter to the engineer certifying <br /> 16 that the poles have been ordered and certifying the manufacturer's planned <br /> 17 delivery date. <br /> I <br /> 18 <br /> 19 B) Equipment Submittal for Traffic Signal Equipment: Within 20 days following <br /> 20 execution of the contract, the contractor shall submit 3 copies of complete <br /> 21 catalog data for the following items: <br /> 22 <br /> 23 Load Switches I 24 Conflict Monitor <br /> 25 Detector Amplifiers <br /> 26 Preemption Equipment <br /> 27 Loop Sealant111 <br /> 28 Vehicle & Pedestrian Signal Heads & Hardware <br /> 29 Service Cabinets <br /> I <br /> 30 Terminal Cabinets <br /> 31 Signal Controllers and Software <br /> 32 Video Detection Systems <br /> 33 Fiber Distribution Units I 34 Fiber Switches <br /> 35 <br /> 36 The equipment shall be approved by the engineer in writing prior to the actual <br /> I <br /> 37 ordering of the equipment. <br /> 38 <br /> 39 <br /> 40 <br /> 41 GAN 8'- __26:(; (24't,:: All` t <br /> 42 Section 8-20.2(2) is new with the following: <br /> 43 <br /> 44 (******) <br /> 45 Television Cameras I <br /> 46 Television cameras shall be supplied as a unit including camera with integrated <br /> 47 lens, id generator, camera controller, pressurized environmental ensclosure, pan <br /> I <br /> 4151 STREET TO WMVD FREIGHT <br /> CORRIDOR IMPROVEMENTS 111 <br /> FED AID#STPUL-9931(012); PW#3472 SP-138 February 10,2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.