My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Marshbank Construction 5/9/2016
>
Contracts
>
Capital Contract
>
Marshbank Construction 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:23:23 AM
Creation date
5/20/2016 10:28:35 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Marshbank Construction
Approval Date
5/9/2016
Council Approval Date
4/16/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
41st St to W Marine View Dr Corridor Imprvts
Public Works WO Number
PW 3472
Tracking Number
0000049
Total Compensation
$2,758,753.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Marshbank Construction 1/25/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
MARSHBANK CONSTRUCTION 3/26/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Marshbank Construction 6/26/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 is encountered, as determined by Engineer,En ineer, where settlement of subgrade has I <br /> 2 occurred, the unsuitable material shall be removed and the excavation shall be <br /> I <br /> 3 backfilled with Quarry Spalls or Gravel Borrow, as directed by the Engineer, and <br /> 4 thoroughly compacted. <br /> 5 <br /> 6 Care shall be taken to avoid damage to existing sprinkler systems and/or <br /> I <br /> 7 landscaped areas. Damage to sprinkler systems shall be repaired with the <br /> 8 appropriate equipment and left operable. Final payment to the Contractor shall be <br /> 9 withheld until the systems are repaired to the owner's satisfaction and landscaping <br /> I <br /> 10 restored. <br /> 11 <br /> 12 I 13 CNH¢S ,2. :3,(1 ;; =ON RAGTINGAGENCY,OWNEDE=:UIR. IENTtRTF <br /> 14 Contracting Agency Owned Equipment <br /> 15 A portion of the temporary or existing electrical equipment to be removed shall I 16 remain the property of the Contracting Agency. <br /> 17 <br /> 18 Where called for in the Plans, the following shall be disconnected, dismantled, and , <br /> 19 delivered to the Contracting Agency: <br /> 20 <br /> 21 Type 3 Traffic Signal Standard from Pacific and Rucker <br /> 22 Traffic signal cabinets, controllers, and all auxiliary equipment and Ethernet <br /> 23 switches <br /> 24 Service cabinets <br /> 25 Signal displays, pedestrian displays, preempt detectors, and pushbuttons I 26 <br /> 27 Traffic signal poles, signal displays, and pedestrian displays which remain the <br /> 28 property of the Contracting Agency shall be delivered to: <br /> 29 <br /> 30 City of Everett Pole Yard <br /> 31 4015 Railway Ave. I 32 Everett, WA 98201 <br /> 33 Phone: (425) 257-7296 <br /> 34 <br /> 35 All other removed electrical equipment which remains the property of the <br /> 36 Contracting Agency shall be delivered to: <br /> 37 <br /> 38 City of Everett Signal Shop <br /> I <br /> 39 3200 Cedar St. <br /> 40 Everett, WA 98201 <br /> 41 Phone: (425) 257-7296 <br /> 42 <br /> 43 Five days written advance notice shall be delivered to the Engineer. Delivery shall <br /> 44 occur during the hours of 8:00 a.m. to 2:00 p.m. Monday through Friday. I 45 <br /> 46 Equipment damaged during removal or delivery shall be repaired or replaced to the <br /> 47 Engineer's satisfaction at no cost to the Contracting Agency. III48 <br /> 49 The Contractor shall be responsible for unloading the equipment where directed by <br /> 50 the Engineer at the delivery site. <br /> I <br /> 41'`STREET TO WMVD FREIGHT - I <br /> CORRIDOR IMPROVEMENTS <br /> FED AID#STPUL-9931(012);PW#3472 SP-140 February 10,2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.