Laserfiche WebLink
I <br /> 1 is encountered, as determined by Engineer,En ineer, where settlement of subgrade has I <br /> 2 occurred, the unsuitable material shall be removed and the excavation shall be <br /> I <br /> 3 backfilled with Quarry Spalls or Gravel Borrow, as directed by the Engineer, and <br /> 4 thoroughly compacted. <br /> 5 <br /> 6 Care shall be taken to avoid damage to existing sprinkler systems and/or <br /> I <br /> 7 landscaped areas. Damage to sprinkler systems shall be repaired with the <br /> 8 appropriate equipment and left operable. Final payment to the Contractor shall be <br /> 9 withheld until the systems are repaired to the owner's satisfaction and landscaping <br /> I <br /> 10 restored. <br /> 11 <br /> 12 I 13 CNH¢S ,2. :3,(1 ;; =ON RAGTINGAGENCY,OWNEDE=:UIR. IENTtRTF <br /> 14 Contracting Agency Owned Equipment <br /> 15 A portion of the temporary or existing electrical equipment to be removed shall I 16 remain the property of the Contracting Agency. <br /> 17 <br /> 18 Where called for in the Plans, the following shall be disconnected, dismantled, and , <br /> 19 delivered to the Contracting Agency: <br /> 20 <br /> 21 Type 3 Traffic Signal Standard from Pacific and Rucker <br /> 22 Traffic signal cabinets, controllers, and all auxiliary equipment and Ethernet <br /> 23 switches <br /> 24 Service cabinets <br /> 25 Signal displays, pedestrian displays, preempt detectors, and pushbuttons I 26 <br /> 27 Traffic signal poles, signal displays, and pedestrian displays which remain the <br /> 28 property of the Contracting Agency shall be delivered to: <br /> 29 <br /> 30 City of Everett Pole Yard <br /> 31 4015 Railway Ave. I 32 Everett, WA 98201 <br /> 33 Phone: (425) 257-7296 <br /> 34 <br /> 35 All other removed electrical equipment which remains the property of the <br /> 36 Contracting Agency shall be delivered to: <br /> 37 <br /> 38 City of Everett Signal Shop <br /> I <br /> 39 3200 Cedar St. <br /> 40 Everett, WA 98201 <br /> 41 Phone: (425) 257-7296 <br /> 42 <br /> 43 Five days written advance notice shall be delivered to the Engineer. Delivery shall <br /> 44 occur during the hours of 8:00 a.m. to 2:00 p.m. Monday through Friday. I 45 <br /> 46 Equipment damaged during removal or delivery shall be repaired or replaced to the <br /> 47 Engineer's satisfaction at no cost to the Contracting Agency. III48 <br /> 49 The Contractor shall be responsible for unloading the equipment where directed by <br /> 50 the Engineer at the delivery site. <br /> I <br /> 41'`STREET TO WMVD FREIGHT - I <br /> CORRIDOR IMPROVEMENTS <br /> FED AID#STPUL-9931(012);PW#3472 SP-140 February 10,2016 <br />