My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Marshbank Construction 5/9/2016
>
Contracts
>
Capital Contract
>
Marshbank Construction 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:23:23 AM
Creation date
5/20/2016 10:28:35 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Marshbank Construction
Approval Date
5/9/2016
Council Approval Date
4/16/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
41st St to W Marine View Dr Corridor Imprvts
Public Works WO Number
PW 3472
Tracking Number
0000049
Total Compensation
$2,758,753.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Marshbank Construction 1/25/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
MARSHBANK CONSTRUCTION 3/26/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Marshbank Construction 6/26/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> 1 Prevailing Wage Rates For Public Works Contracts does not exempt the use of <br /> 2 form 1444 for the purpose of determining a federal classification wage rate. <br /> 3 <br /> 4 11;07:11 GR1 <br /> 5 Requirements for Nondiscrimination <br /> 6 <br /> 7 0-.]SIN; S 1 R1 <br /> 8 Section 1-07.11 is supplemented with the following: <br /> 9 <br /> 10 1107 1:OP „1�:G R <br /> 11 (August 5, 2013) <br /> 12 Requirement for Affirmative Action to Ensure Equal Employment Opportunity (Executive <br /> 13 Order 11246) <br /> 14 <br /> 15 1. The Contractor's attention is called to the Equal Opportunity Clause and the <br /> 16 Standard Federal Equal Employment Opportunity Construction Contract <br /> 17 Specifications set forth herein. <br /> 18 <br /> 19 2. The goals and timetables for minority and female participation set by the Office of <br /> 20 Federal Contract Compliance Programs, expressed in percentage terms for the <br /> 21 Contractor's aggregate work force in each construction craft and in each trade on <br /> 22 all construction work in the covered area, are as follows: <br /> 23 <br /> 24 Women - Statewide <br /> 25 <br /> 26 Timetable Goal <br /> 27 <br /> 28 Until further notice 6.9% <br /> 29 Minorities - by Standard Metropolitan Statistical Area (SMSA) <br /> 30 <br /> 31 Spokane, WA: <br /> 32 SMSA Counties: <br /> 33 Spokane, WA 2.8 <br /> 34 WA Spokane. <br /> 35 Non-SMSA Counties 3.0 <br /> 36 WA Adams; WA Asotin; WA Columbia; WA Ferry; WA Garfield; WA <br /> 37 Lincoln, WA Pend Oreille; WA Stevens; WA Whitman. <br /> 38 <br /> 39 Richland, WA <br /> 40 SMSA Counties: <br /> 41 Richland Kennewick, WA 5.4 <br /> 42 WA Benton; WA Franklin. <br /> 43 Non-SMSA Counties 3.6 <br /> 44 WA Walla Walla. <br /> 45 <br /> 1 <br /> 415t STREET TO WMVD FREIGHT <br /> CORRIDOR IMPROVEMENTS <br /> FED AID#STPUL-9931(012); PW#3472 SP-36 February 10, 2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.