My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Marshbank Construction 5/9/2016
>
Contracts
>
Capital Contract
>
Marshbank Construction 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 9:23:23 AM
Creation date
5/20/2016 10:28:35 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Marshbank Construction
Approval Date
5/9/2016
Council Approval Date
4/16/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
41st St to W Marine View Dr Corridor Imprvts
Public Works WO Number
PW 3472
Tracking Number
0000049
Total Compensation
$2,758,753.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Marshbank Construction 1/25/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
MARSHBANK CONSTRUCTION 3/26/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Marshbank Construction 6/26/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> 1 placement of all necessary signs and traffic control devices in accordance with 1-10.1(2). <br /> I 2 Upon construction of the fencing, the Contractor shall request the Engineer to inspect <br /> 3 the fence. No other work shall be performed on the site until the Contracting Agency has <br /> 4 accepted the installation of high visibility fencing, as described in the Contract. <br /> 1 5 <br /> 6 '1O8.5;GR1 <br /> 7 Time for Completion <br /> 1 8 <br /> EirentWeirditil <br /> 10 Section 1-08.5 is supplemented with the following: <br /> I 11 <br /> 12 108501i0tRARTF <br /> 13 1-08.5 Time for Completion <br /> I 14 (August 14, 2013 APWA GSP, Option A) <br /> 15 <br /> 16 Revise the third and fourth paragraphs to read: <br /> I 17 <br /> 18 Contract time shall begin on the first working day following the Notice to Proceed Date. <br /> 19 <br /> 20 Each working day shall be charged to the contract as it occurs, until the contract work is <br /> I21 physically complete. If substantial completion has been granted and all the authorized <br /> 22 working days have been used, charging of working days will cease. Each week the <br /> 23 Engineer will provide the Contractor a statement that shows the number of working days: <br /> 24 (1) charged to the contract the week before; (2) specified for the physical completion of <br /> 25 the contract; and (3) remaining for the physical completion of the contract. The <br /> 26 statement will also show the nonworking days and any partial or whole day the Engineer <br /> I 27 declares as unworkable. Within 10 calendar days after the date of each statement, the <br /> 28 Contractor shall file a written protest of any alleged discrepancies in it. To be considered <br /> 29 by the Engineer, the protest shall be in sufficient detail to enable the Engineer to <br /> I 30 ascertain the basis and amount of time disputed. By not filing such detailed protest in <br /> 31 that period, the Contractor shall be deemed as having accepted the statement as <br /> 32 correct. If the Contractor is approved to work 10 hours a day and 4 days a week (a 4-10 <br /> I 33 schedule) and the fifth day of the week in which a 4-10 shift is worked would ordinarily <br /> 34 be charged as a working day then the fifth day of that week will be charged as a working <br /> 35 day whether or not the Contractor works on that day. <br /> 36 <br /> I37 Revise the sixth paragraph to read: <br /> 38 <br /> 39 The Engineer will give the Contractor written notice of the completion date of the <br /> I 40 contract after all the Contractor's obligations under the contract have been performed by <br /> 41 the Contractor. The following events must occur before the Completion Date can be <br /> 42 established: <br /> 43 1. The physical work on the project must be complete; and <br /> 44 2. The Contractor must furnish all documentation required by the contract and required <br /> I 45 by law, to allow the Contracting Agency to process final acceptance of the contract. <br /> 46 The following documents must be received by the Project Engineer prior to <br /> 47 establishing a completion date: <br /> I 48 a. Certified Payrolls (per Section 1-07.9(5)). <br /> 49 b. Material Acceptance Certification Documents <br /> I 41''STREET TO WMVD FREIGHT <br /> CORRIDOR IMPROVEMENTS <br /> FED AID#STPUL-9931(012);PW#3472 SP-69 February 10,2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.