Laserfiche WebLink
I <br /> I <br /> 1 c. Quarterly Reports of Amounts Credited as DBE Participation, as required by the <br /> 2 Contract Provisions. <br /> 3 d. Final Contract Voucher Certification <br /> 4 e. Copies of the approved "Affidavit of Prevailing Wages Paid" for the Contractor <br /> 5 and all Subcontractors <br /> 6 f. Property owner releases per Section 1-07.24 <br /> 7 <br /> 8 rff.i•.6: PT7 o TiWi' D Y it <br /> ch 13, 1995) <br /> 10 This 9 rpr project shall be physically completed within *** 85*** working days. <br /> 11 <br /> 12 <br /> 13 _ <br /> 14 1Q 86. .,—„ <br /> 15 Suspension of Work <br /> 16 <br /> 17 e8"6 I ..` ,G 1' <br /> 18 Section 1-08.6 is supplemented with the following: <br /> 19 <br /> 20 !If•® 3 ° °.Q . J R © X <br /> 21 (January 5, 2015) <br /> 22 Contract time may be suspended for the HMA mix design evaluation report or for <br /> 23 procurement of critical materials (Procurement Suspension). In order to receive a <br /> 24 Procurement Suspension, the Contractor shall within 21 calendar days after execution <br /> 25 by the Contracting Agency, submit all HMA mix designs according to section 5-04.3(7)A <br /> 26 or place purchase orders for all materials deemed critical by the Contracting Agency for <br /> 27 physical completion of the contract. The Contractor shall provide a copy of the <br /> 28 completed DOT Form 350-042 indicating the date the mix design was submitted, or <br /> 29 copies of purchase orders for the critical materials. Such purchase orders shall disclose <br /> 30 the purchase order date and estimated delivery dates for such critical material. I. <br /> 31 <br /> 32 The Contractor shall show the HMA mix design evaluation report or procurement of the <br /> 33 materials listed below as activities in the Progress Schedule. If the approved Progress <br /> 34 Schedule indicates that acceptance of the HMA mix designs or materials procurement <br /> 35 are critical activities, and if the Contractor has provided documentation that mix designs <br /> 36 are submitted or purchase orders are placed for the critical materials within the <br /> 37 prescribed 21 calendar days, then contract time shall be suspended upon physical <br /> 38 completion of all critical work except that work dependent upon the below listed critical <br /> 39 materials: <br /> 40 <br /> 41 *,** <br /> 42 PPB POLES <br /> 43 TRAFFIC`SIGNALtSYSTEM*PACIFIC AVE &W.MARINE VIEWLLDN1 e <br /> 44 TRAFFIC SIGNAL;SYSTEM,PACgIFiCAVE&GRANDAVE <br /> 45 TRAFFIC SIGNAL SYSTEM' PACIFIC;AVE & FUCKER AVE <br /> 46 TRAFFICSIGNAL SYSTEM r41,ST STREET kRUCKERYAVE <br /> 47 TRAFFICu.SIGNALSYSTEM 41?T STREET&Cn0 HBYAVE <br /> 48 T RAFFIC SIGNAL SYSTEM RUCKER AVE& 35 AVE <br /> 49 COMMUNICATION SYSTEM: R I <br /> UCKER AVE�TO W MARINE VIEW DR°� <br /> 41st STREET TO WMVD FREIGHTII <br /> CORRIDOR IMPROVEMENTS <br /> FED AID#STPUL-9931(012); PW#3472 SP-70 February 10,2016 <br />