Laserfiche WebLink
I <br /> 1 with sufficient water so the longitudinal depressions remain in the soil surface until <br /> I <br /> 2 completion of the seeding. <br /> 3 <br /> 4 8-01.3(2)B Seeding and Fertilizing <br /> I 5 In the list in the second paragraph, item numbers 1-5 are revised to read: <br /> 6 <br /> 7 1. A hydro seeder that utilizes water as the carrying agent, and maintains continuous <br /> 8 agitation through paddle blades. It shall have an operating capacity sufficient to <br /> I 9 agitate, suspend, and mix into a homogeneous slurry the specified amount of seed <br /> 10 and water or other material. Distribution and discharge lines shall be large enough to <br /> 11 prevent stoppage and shall be equipped with a set of hydraulic discharge spray <br /> 12 nozzles that will provide a uniform distribution of the slurry. <br /> 13 <br /> 14 2. Blower equipment with an adjustable disseminating device capable of maintaining a <br /> 15 constant, measured rate of material discharge that will ensure an even distribution of <br /> 16 seed at the rates specified. <br /> 17 <br /> I 18 3. Helicopters properly equipped for aerial seeding. <br /> 19 <br /> 20 4. Power-drawn drills or seeders. <br /> I 21 <br /> 22 5. Areas in which the above methods are impractical may be seeded by hand <br /> 23 methods. <br /> 24 <br /> I 25 8-01.3(2)C Liming <br /> 26 This section including title is deleted in its entirety and replaced with the following: <br /> 27 <br /> 1 <br /> 28 8-01.3(2)C Vacant <br /> 29 <br /> 30 8-01.3(2)D Mulching <br /> I 31 The first sentence of the second paragraph is revised to read: <br /> 32 <br /> 33 Distribution of straw mulch material shall be by means that utilizes forced air to blow <br /> I 34 mulch material on seeded areas. <br /> 35 <br /> 36 8-01.3(11) Outlet Protection <br /> I 37 In the last sentence, "Section 9-13.6" is revised to read "Section 9-13.1(5)". <br /> 38 <br /> 39 8-01.4 Measurement <br /> I 40 In the twelfth paragraph, "liming" is deleted. <br /> 41 <br /> 42 8-01.5 Payment <br /> I 43 The bid item "Liming", per acre is deleted. <br /> 44 <br /> 45 8-02.AP8 <br /> 1 46 Section 8-02, Roadside Restoration <br /> 47 January 5, 2015 <br /> 1 48 8-02.3(1) Responsibility During Construction <br /> 49 The last sentence of the second paragraph is revised to read: <br /> I <br /> I AMENDMENTS TO THE 2014 STANDARD SPECIFICATIONS BOOK <br /> Revised: 8/3/15 <br />