Laserfiche WebLink
I <br /> 1 8-02.3(3) Weed and Pest Control <br /> ' 2 This section is supplemented with the following new paragraph: <br /> 3 <br /> 4 Grass, including grass applied in accordance with Section 8-01, growing within the <br /> 5 mulch ring of a plant shall be considered a weed and be controlled on the project in <br /> 6 accordance with the weed and pest control plan. <br /> 7 <br /> 8 8-02.3(4) Topsoil <br /> 9 The last sentence of the first paragraph is revised to read: <br /> 10 <br /> 11 After the topsoil has been spread, all large clods, hard lumps, and rocks 2 inches in <br /> 12 diameter and larger, and litter shall be raked up, removed, and disposed of by the <br /> 13 Contractor. <br /> 14 <br /> 15 The following new paragraph is inserted after the first paragraph: <br /> 16 <br /> 17 Topsoil stockpiled for project use shall be protected to prevent erosion and weed <br /> 18 growth. Weed growth on topsoil stockpile sites shall be immediately eliminated in <br /> 19 accordance with the approved Weed and Pest Control Plan. <br /> 20 <br /> 21 8-02.3(4)C Topsoil Type C <br /> 22 The last sentence is revised to read: <br /> 23 <br /> 24 Topsoil Type C shall meet the requirements of Sections 8-02.3(4), 8-02.3(4)B, and 9- <br /> 1 25 14.1(3). <br /> 26 <br /> 27 8-02.3(12) Completion of Initial Planting <br /> 28 Item number 4 in the last paragraph is deleted. <br /> 29 <br /> 30 8-02.3(13) Plant Establishment <br /> 31 The first sentence of the second paragraph is deleted. <br /> 32 <br /> 33 The second paragraph is supplemented with the following new sentence: <br /> I 34 <br /> 35 The 1 calendar year shall be extended an amount equal to any periods where the <br /> 36 Contractor does not comply with the plant establishment plan. <br /> 1 37 <br /> 38 The first sentence of the fourth paragraph is revised to read: <br /> 39 <br /> 40 During the first year of plant establishment under PSIPE (Plant Selection Including Plant <br /> 41 Establishment), the Contractor shall meet monthly with the Engineer for the purpose of <br /> 42 joint inspection of the planting material on a mutually agreed upon schedule. <br /> 43 <br /> 44 The last two paragraphs are deleted. <br /> 45 <br /> 46 8-02.4 Measurement <br /> 1 47 This section is supplemented with the following: <br /> 48 <br /> 49 Plant selection will be measured per each. <br /> I 50 <br /> 51 PSIPE _ (Plant Selection Including Plant Establishment) will be measured per each. <br /> 52 <br /> AMENDMENTS TO THE 2014 STANDARD SPECIFICATIONS BOOK <br /> Revised: 8/3/15 <br />