My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ariston Pacific, Inc. 5/9/2016
>
Contracts
>
Capital Contract
>
Ariston Pacific, Inc. 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 10:38:43 AM
Creation date
5/20/2016 11:08:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Ariston Pacific, Inc.
Approval Date
5/9/2016
Council Approval Date
2/24/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Pacific & Broadway/Citywide Safety Impvts
Public Works WO Number
PW3523 & PW3524
Tracking Number
0000050
Total Compensation
$1,062,314.79
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Ariston Pacific, Inc. 4/17/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Public Works 10/18/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 8-02.5 Payment <br /> 2 The paragraph following the bid item "Topsoil Type ", per acre is revised to read: <br /> 3 <br /> 4 The unit Contract price per acre for"Topsoil Type " shall be full payment for all <br /> 5 costs for the specified Work. <br /> 6 <br /> 7 The bid item "PSIPE ", per each and the paragraph following the bid item are revised to <br /> 8 read: <br /> 9 <br /> 10 "PSIPE ", per each. <br /> 11 <br /> 12 The unit Contract price for"Plant Selection ", per each, and "PSIPE ", per each, <br /> 13 shall be full pay for all Work necessary for weed control within the planting area, <br /> 14 planting area preparation, fine grading, planting, cultivating, plant storage and <br /> 15 protection, fertilizer and root dip, staking, cleanup, and water necessary to complete <br /> 16 planting operations as specified to the end of first year plant establishment. <br /> 17 <br /> 18 The bid item "Plant Establishment- Year" is deleted. <br /> 191 <br /> 20 8-04.AP8 <br /> 21 Section 8-04, Curbs, Gutters, and Spillways 1 <br /> 22 January 5, 2015 <br /> 23 8-04.2 Materials <br /> 24 The referenced section for the following item is revised to read: <br /> 25 <br /> 26 Hand Placed Riprap 9-13.1(4) 111 <br /> 27 <br /> 28 8-04.3(1) Cement Concrete Curbs, Gutters, and Spillways <br /> 29 The first sentence in the fourth paragraph is revised to read: <br /> 30 <br /> 31 Expansion joints in the curb or curb and gutter shall be spaced as shown in the Plans, <br /> 32 and placed at the beginning and ends of curb returns, drainage Structures, bridges, and <br /> 33 cold joints with existing curbs and gutters. <br /> 34 <br /> 35 In the third sentence of the fourth paragraph, "1/4-inch" is revised to read "%-inch". <br /> 36 <br /> 37 8-04.3(1)A Extruded Cement Concrete Curb <br /> 38 The second sentence in the second paragraph is revised to read: <br /> 39 <br /> 40 Cement concrete curbs shall be anchored to the existing pavement by placing steel <br /> 41 reinforcing bars 1 foot on each side of every joint. <br /> 42 <br /> 43 The third paragraph is revised to read: <br /> 44 <br /> 45 Steel reinforcing bars shall meet the dimensions shown in the Standard Plans. <br /> 46 <br /> I <br /> I <br /> AMENDMENTS TO THE 2014 STANDARD SPECIFICATIONS BOOK <br /> Revised: 8/3/15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.