My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ariston Pacific, Inc. 5/9/2016
>
Contracts
>
Capital Contract
>
Ariston Pacific, Inc. 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 10:38:43 AM
Creation date
5/20/2016 11:08:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Ariston Pacific, Inc.
Approval Date
5/9/2016
Council Approval Date
2/24/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Pacific & Broadway/Citywide Safety Impvts
Public Works WO Number
PW3523 & PW3524
Tracking Number
0000050
Total Compensation
$1,062,314.79
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Ariston Pacific, Inc. 4/17/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Public Works 10/18/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 1 8-21.AP8 <br /> 1 2 Section 8-21, Permanent Signing <br /> 3 August 3, 2015 <br /> I4 8-21.2 Materials <br /> 5 This section is revised to read: <br /> 6 <br /> 1 7 Materials shall meet the requirements of the following sections: <br /> 8 <br /> 9 Roadside Sign Structures 9-06.16 <br /> 1 10 Permanent Signs 9-28 <br /> 11 Sign Support Structures 9-28.14 <br /> 12 <br /> I 13 The Contractor shall submit a Manufacturer's Certificate of Compliance for all <br /> 14 permanent signs; a copy of the Manufacturer's Certificate of Compliance shall be <br /> 15 available at the fabricator's plant. Permanent signs will be inspected at the fabricator's <br /> I 16 plant prior to shipment to the project unless otherwise accepted by the Engineer. Signs <br /> 17 without an approved decal shall not be installed on the project with the exception of <br /> 18 double-faced signs which do not receive decals or fabricator's stickers. <br /> 19 <br /> 1 <br /> 20 8-21.3(9)F Foundations <br /> 21 The first sentence of the first paragraph is revised to read: <br /> 22 <br /> I23 The excavation and backfill shall conform to the requirements of Section 2-09.3. <br /> 24 <br /> 25 8-22.AP8 <br /> I26 Section 8-22, Pavement Marking <br /> 27 April 6, 2015 <br /> I28 8-22.3(6) Removal of Pavement Markings <br /> 29 The second and third sentences of the first paragraph are revised to read: <br /> I 30 <br /> 31 Grinding to remove pavement markings is allowed prior to application of a Bituminous <br /> 32 Surface Treatment. Grinding to remove pavement marking from hot mix asphalt and <br /> I 33 cement concrete pavements is allowed to a depth just above the pavement surface, <br /> 34 then water blasting or shot blasting shall be required to remove the remaining markings. <br /> 35 <br /> I36 8-23.AP8 <br /> 37 Section 8-23, Temporary Pavement Markings <br /> I38 January 5, 2015 <br /> 39 This section's content is deleted in its entirety and replaced with the following new sub- <br /> 40 sections: <br /> 1 41 <br /> 42 8-23.1 Description <br /> 43 The Work consists of furnishing, installing, and removing temporary pavement <br /> 1 44 markings. Temporary pavement markings shall be provided where noted in the Plans; <br /> I <br /> I AMENDMENTS TO THE 2014 STANDARD SPECIFICATIONS BOOK <br /> Revised: 8/3/15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.