Laserfiche WebLink
I <br /> 1 transition from new pavement to existing pavement. The Contractor shall I <br /> 2 submit these changes to the Project Engineer for review and approval 10 days <br /> 3 prior to the beginning of work. I 4 <br /> 5 The Contractor shall provide the Contracting Agency copies of any calculations and <br /> 6 staking data when requested by the Engineer. I 7 <br /> 8 To facilitate the establishment of these lines and elevations, the Contracting Agency will <br /> 9 provide the Contractor with primary survey control information consisting of descriptions <br /> I <br /> 10 of two primary control points used for the horizontal and vertical control, and <br /> 11 descriptions of two additional primary control points for every additional three miles of <br /> 12 project length. Primary control points will be described by reference to the project <br /> I <br /> 13 alignment and the coordinate system and elevation datum utilized by the project. In <br /> 14 addition, the Contracting Agency will supply horizontal coordinates for the beginning <br /> 15 and ending points and for each Point of Intersection (PI) on each alignment included in <br /> 16 the project. <br /> I <br /> 17 <br /> 18 The Contractor shall ensure a surveying accuracy within the following tolerances: <br /> 19 <br /> I <br /> 20 Vertical Horizontal <br /> 21 Slope stakes ±0.10 feet ±0.10 feet <br /> 22 Subgrade grade stakes set I 23 0.04 feet below grade ±0.01 feet ±0.5 feet <br /> 24 (parallel to alignment) <br /> 25 ±0.1 feet I 26 (normal to alignment) <br /> 27 <br /> 28 Stationing on roadway N/A ±0.1 feet I 29 Alignment on roadway N/A ±0.04 feet <br /> 30 Surfacing grade stakes ±0.01 feet ±0.5 feet <br /> 31 (parallel to alignment) <br /> I <br /> 32 ±0.1 feet <br /> 33 (normal to alignment) <br /> 34 <br /> 35 Roadway paving pins for I <br /> 36 surfacing or paving ±0.01 feet ±0.2 feet <br /> 37 (parallel to alignment) <br /> 38 ±0.1 feet <br /> I <br /> 39 (normal to alignment) <br /> 40 <br /> 41 The Contracting Agency may spot-check the Contractor's surveying. These spot- t <br /> 42 checks will not change the requirements for normal checking by the Contractor. <br /> 43 <br /> 44 When staking roadway alignment and stationing, the Contractor shall perform <br /> I <br /> 45 independent checks from different secondary control to ensure that the points staked <br /> 46 are within the specified survey accuracy tolerances. <br /> 47 <br /> I <br /> 48 The Contractor shall calculate coordinates for the alignment. The Contracting Agency <br /> 49 will verify these coordinates prior to issuing approval to the Contractor for commencing <br /> I <br /> PACIFIC&BROADWAY SAFETY IMPROVEMENTS <br /> I <br /> FED AID#HSIP-0005(331);COE#3523 <br /> CITYWIDE SAFETY IMPROVEMENTS <br /> FED AID#HSIP-0005(330);COE#3524 14 December 23,2015 <br />