1 amount designated on the QPL for the mix design. Anti-strip is not required for <br /> 2 temporary work that will be removed prior to Completion. <br /> 3 <br /> 4 5-04.4 Measurement <br /> 5 The following new paragraph is inserted after the first paragraph: <br /> 6 <br /> 7 Roadway cores will be measured per each for the number of cores taken. <br /> 8 <br /> 9 The second to last paragraph is deleted. <br /> 10 <br /> 11 5-04.5 Payment <br /> 12 The bid item "Removing Temporary Pavement Marking", per linear foot and paragraph <br /> 13 following bid item are deleted. <br /> 14 <br /> 15 The following new bid item is inserted before the second to last paragraph: <br /> 16 <br /> 17 "Roadway Core", per each. <br /> 18 <br /> 19 The Contractor's costs for all other Work associated with the coring (e.g., traffic control) <br /> 20 shall be incidental and included within the unit Bid price per each and no additional <br /> 21 payments will be made. <br /> 22 <br /> 23 5-05.AP5 <br /> 24 Section 5-05, Cement Concrete Pavement f <br /> 25 April 6, 2015 <br /> 26 5-05.3(1) Concrete Mix Design for Paving ' <br /> 27 In item number 1, the first sentence of the third paragraph is revised to read: <br /> 28 <br /> 29 Ground granulated blast furnace slag, if used, shall not exceed 30 percent by weight of <br /> 30 the total cementitious material and shall conform to Section 9-23.10. <br /> 31 <br /> 32 The second and third rows of the table in item number 3 are revised to read: <br /> 33 <br /> Coarse Aggregate + 30 Pounds - 30 Pounds <br /> Fine Aggregate + 30 Pounds - 30 Pounds <br /> 34 <br /> 35 5-05.4 Measurement <br /> 36 The fourth paragraph is supplemented with the following new sentence: <br /> 37 <br /> 38 Tie bars with drill holes in cement concrete pavement placed under the Contract will not <br /> 39 be measured. <br /> 40 <br /> 41 5-05.5 Payment <br /> 42 The paragraph following the Bid item "Tie Bar with Drill Hole", per each is supplemented with <br /> 43 the following new sentence: I <br /> 44 <br /> 45 All costs for tie bars with drill holes in cement concrete pavement placed under the <br /> 46 Contract shall be included in the unit Contract price per cubic yard for"Cement Conc. <br /> 47 Pavement". <br /> I <br /> AMENDMENTS TO THE 2014 STANDARD SPECIFICATIONS BOOK <br /> Revised: 8/3/15 <br />