My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ariston Pacific, Inc. 5/9/2016
>
Contracts
>
Capital Contract
>
Ariston Pacific, Inc. 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 10:38:43 AM
Creation date
5/20/2016 11:08:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Ariston Pacific, Inc.
Approval Date
5/9/2016
Council Approval Date
2/24/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Pacific & Broadway/Citywide Safety Impvts
Public Works WO Number
PW3523 & PW3524
Tracking Number
0000050
Total Compensation
$1,062,314.79
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Ariston Pacific, Inc. 4/17/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Public Works 10/18/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 2 6-01.AP6 <br /> 3 Section 6-01, General Requirements for Structures <br /> ' 4 January 5, 2015 <br /> 5 6-01.6 Load Restrictions on Bridges Under Construction <br /> 6 The first sentence of the second paragraph is revised to read: <br /> 7 <br /> 8 If necessary and safe to do so, and if the Contractor requests it through a Type 2E <br /> 9 Working Drawing, the Engineer may allow traffic on a bridge prior to completion. <br /> ' 10 <br /> 11 In the second paragraph, item number 3 (up until the colon) is revised to read: <br /> 12 <br /> 13 3. Provide stress calculations under the design criteria specified in the AASHTO LRFD <br /> 14 Bridge Design Specifications, current edition, including at a minimum the following: <br /> 15 <br /> 16 6-01.9 Working Drawings <br /> 17 This section is revised to read: <br /> 18 <br /> 1 19 <br /> 20 All Working Drawings required for bridges and other Structures shall conform to Section <br /> 1-05.3. <br /> 21 <br /> 22 6-01.10 Utilities Supported by or Attached to Bridges <br /> i 23 In the second paragraph,"bridge structures" is revised to read "bridges". <br /> 24 <br /> 25 6-01.14 Premolded Joint Filler <br /> ' 26 In the second paragraph, the first sentence is revised to read: <br /> 27 <br /> 28 The Contractor may substitute for the nails any adhesive acceptable to the Engineer. <br /> 29 <br /> 30 6-02.AP6 <br /> ' 31 Section 6-02, Concrete Structures <br /> 32 August 3, 2015 <br /> 33 6-02.2 Materials <br /> 34 The reference to "Prestressed Concrete Girders" (Section 9-19) is deleted. <br /> 35 <br /> ' 36 6-02.3(1) Classification of Structural Concrete <br /> 37 In paragraph two, item number 1 is revised to read: <br /> 38 <br /> 39 Mix design and proportioning specified in Sections 6-02.3(2), 6-02.3(2)A and 6- <br /> 40 02.3(2)A1. <br /> 41 <br /> 42 Item number 3 is renumbered to 4. <br /> 43 <br /> 44 After the preceding Amendments are applied, the following new numbered item is inserted <br /> 45 after item number 2: <br /> 46 <br /> 47 3. Temperature and time for placement requirements specified in Section 6-02.3(4)D. <br /> I <br /> AMENDMENTS TO THE 2014 STANDARD SPECIFICATIONS BOOK <br /> Revised: 8/3/15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.