My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ariston Pacific, Inc. 5/9/2016
>
Contracts
>
Capital Contract
>
Ariston Pacific, Inc. 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 10:38:43 AM
Creation date
5/20/2016 11:08:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Ariston Pacific, Inc.
Approval Date
5/9/2016
Council Approval Date
2/24/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Pacific & Broadway/Citywide Safety Impvts
Public Works WO Number
PW3523 & PW3524
Tracking Number
0000050
Total Compensation
$1,062,314.79
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Ariston Pacific, Inc. 4/17/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Public Works 10/18/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 3. The Contract number, Contract title, and sequential sheet number. These shall <br /> 2 also be on any related documents. <br /> 3 <br /> 4 4. Identify where the falsework and formwork plan will be utilized by referencing <br /> 5 Contract Plan sheet number and related item or detail. <br /> 6 <br /> 7 6-02.3(16)A Nonpreapproved Falsework and Formwork Plans <br /> 8 This section, including title, is deleted in its entirety and replaced with the following: <br /> 9 1 <br /> 10 6-02.3(16)A Vacant <br /> 11 <br /> 12 6-02.3(16)B Preapproved Formwork Plans I <br /> 13 This section, including title, is revised to read: <br /> 14 <br /> 15 6-02.3(16)B Pre-Contract Review of Falsework and Formwork Plans <br /> 16 The Contractor may request pre-contract review of formwork plans for abutments, <br /> 17 wingwalls, diaphragms, retaining walls, columns, girders and beams, box culverts, <br /> 18 railings, and bulkheads. Plans for falsework supporting the bridge deck for interior <br /> 19 spans between precast prestressed concrete girders may also be submitted for pre- <br /> 20 contract review. <br /> 21 <br /> 22 To obtain pre-contract review, the Contractor shall electronically submit drawings and <br /> 23 design calculations in PDF format directly to: <br /> 24 <br /> 25 BridgeConstructionSupport@wsdot.wa.gov <br /> 26 <br /> 27 The Bridge and Structures Office, Construction Support Engineer will return the <br /> 28 falsework or formwork plan to the Contractor with review notes, an effective date of <br /> 29 review, and any revisions needed prior to use. For each contract on which the pre- <br /> 30 reviewed falsework or formwork plans will be used, the Contractor shall submit a copy <br /> 31 to the Engineer. Construction shall not begin until the Engineer has given concurrence. <br /> 32 1111 <br /> 33 If the falsework or formwork being constructed has any deviations to the preapproved <br /> 34 falsework or formwork plan, the Contractor shall submit plan revisions for review and <br /> 35 approval in accordance with Section 6-02.3(16). <br /> 36 <br /> 37 6-02.3(17)A Design Loads <br /> 38 The fifth paragraph is revised to read: <br /> 39 <br /> 40 Live loads shall consist of a minimum uniform load of not less than 25 psf, applied over <br /> 41 the entire falsework plan area, plus the greater of: <br /> 42 <br /> 43 1. Actual weights of the deck finishing equipment applied at the rails, or; <br /> 44111 45 2. A minimum load of 75 pounds per linear foot applied at the edge of the bridge <br /> 46 deck. <br /> 47 <br /> 48 6-02.3(17)J Face Lumber, Studs, Wales, and Metal Forms <br /> 49 The second and third to last paragraphs are deleted. <br /> 50 <br /> 51 6-02.3(17)K Concrete Forms on Steel Spans <br /> 52 The second sentence of the last paragraph is revised to read: <br /> 1 <br /> AMENDMENTS TO THE 2014 STANDARD SPECIFICATIONS BOOK <br /> Revised: 8/3/15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.