My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ariston Pacific, Inc. 5/9/2016
>
Contracts
>
Capital Contract
>
Ariston Pacific, Inc. 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 10:38:43 AM
Creation date
5/20/2016 11:08:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Ariston Pacific, Inc.
Approval Date
5/9/2016
Council Approval Date
2/24/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Pacific & Broadway/Citywide Safety Impvts
Public Works WO Number
PW3523 & PW3524
Tracking Number
0000050
Total Compensation
$1,062,314.79
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Ariston Pacific, Inc. 4/17/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Public Works 10/18/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 accordance with Section 6-02.3(27). Compressive strength testing shall be performed a <br /> 2 minimum of once per day and once for every 20 cubic yards of concrete that is placed. <br /> 3 <br /> 4 Concrete for items 1, 2, 4, 5, and 6 in Section 6-02.3(27)A that is not self-consolidating <br /> 5 concrete will be accepted as follows: <br /> 6 <br /> 7 1. Temperature within the allowable temperature band. <br /> 8 <br /> 9 2. Slump below the maximum allowed. <br /> 10 <br /> 11 3. Air content within the required range. <br /> 12 <br /> 13 SCC for items 1, 2, 4, 5, and 6 in Section 6-02.3(27)A will be accepted as follows: <br /> 14 <br /> 15 1. Temperature within the allowable temperature band. <br /> 16 <br /> 17 2. Slump flow within the target slump flow range. <br /> 18 <br /> 19 3. VSI less than or equal to 1 in accordance with ASTM C 1611, Appendix X1, <br /> 20 using Filling Procedure B. <br /> 21 <br /> 22 4. J ring passing ability less than or equal to 1.5-inches. I <br /> 23 <br /> 24 5. Air content within the required range. <br /> 25 <br /> 111 <br /> 26 SCC for concrete barrier will be accepted in accordance with temperature, air, and <br /> 27 compressive strength testing listed above. <br /> 28 <br /> 29 SCC for precast junction boxes, cable vaults, and pull boxes will be accepted in <br /> 30 accordance with the temperature and compressive strength testing listed above. <br /> 31 <br /> 32 SCC for precast drainage structure elements will be accepted in accordance with the <br /> 33 requirements of AASHTO M 199. <br /> 34 <br /> 35 6-02.3(28) Precast Concrete Panels <br /> 36 In the first paragraph, the third sentence is revised to read: <br /> 37 <br /> 38 WSDOT Certification will be granted at, and renewed during, the annual precast plant <br /> 39 review and approval process in accordance with WSDOT Materials Manual M 46-01.04 <br /> 40 Standard Practice QC 7. <br /> 41 <br /> 42 6-02.4 Measurement <br /> 43 The seventh paragraph (up until the colon) is revised to read: <br /> 44 <br /> 45 All reinforcing steel will be measured by the computed weight of all steel required by the <br /> 46 Plans. The weight of mechanical splices will be based on the weight specified in the <br /> 47 manufacturer's catalog cut for the specific item. Splices noted as optional in the Plans <br /> 48 but installed by the Contractor will be included in the measurement. Epoxy-coated bars <br /> 49 will be measured before coating. The Contractor shall furnish (without extra allowance): <br /> 50 <br /> 51 Item number 1 in the seventh paragraph is revised to read: <br /> 52 <br /> AMENDMENTS TO THE 2014 STANDARD SPECIFICATIONS BOOK <br /> Revised: 8/3/15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.