Laserfiche WebLink
I <br /> 1 1. Bracing, spreaders, form blocks, wire clips, and other fasteners. <br /> 2 <br /> 3 The eighth paragraph is deleted. <br /> 4 <br /> 5 The following three new paragraphs are inserted before the last paragraph: <br /> 6 <br /> 7 Expansion joint system seal - superstr. will be measured by the linear foot along its <br /> 8 completed line and slope. <br /> 9 <br /> 10 Expansion joint modification will be measured by the linear foot of expansion joint <br /> 11 modified along its completed line and slope. <br /> I 12 <br /> 13 Prestressed concrete girder will be measured by the linear foot of girder specified in the <br /> 14 Proposal. <br /> I 15 <br /> 16 6-02.5 Payment <br /> 17 In the paragraph following the bid item "Commercial Concrete", per cubic yard the second <br /> 18 sentence is revised to read: <br /> 19 <br /> 20 All costs in connection with concrete curing, producing concrete surface finish with form <br /> 21 liners, and furnishing and applying pigmented sealer to concrete surfaces as specified, <br /> 22 shall be included in the unit contract price per cubic yard for"Conc. Class <br /> 23 <br /> 24 The following new paragraph is inserted after the bid item "Superstructure (name bridge)", <br /> 1 25 lump sum: <br /> 26 <br /> 27 All costs in connection with constructing, finishing and removing the bridge deck test <br /> 28 slab as specified in Section 6-02.3(10)D1 shall be included in the lump sum Contract <br /> 29 price for"Superstructure_" or"Bridge Deck " for one bridge in each project, as <br /> 30 applicable. <br /> I 31 <br /> 32 In the paragraph following the bid item "Epoxy-Coated St. Reinf. Bar ", per pound, the <br /> 33 first sentence is revised to read: <br /> 34 <br /> 35 Payment for reinforcing steel shall include the cost of drilling holes in concrete for, and <br /> 36 setting, steel reinforcing bar dowels with epoxy bonding agent, and furnishing, <br /> 37 fabricating, placing, and splicing the reinforcement. <br /> 38 <br /> 39 The bid item "Cure Box", lump sum and paragraph following bid item are deleted. <br /> 40 <br /> 41 The following three new bid items are inserted before the bid item "Bridge Approach Slab", <br /> 42 per square yard: <br /> 43 <br /> 44 "Expansion Joint System - Superstr.", per linear foot. <br /> 45 <br /> 46 "Expansion Joint Modification - ", per linear foot. <br /> I 47 <br /> 48 "Prestressed Conc. Girder ", per linear foot. <br /> 49 <br /> i <br /> I <br /> AMENDMENTS TO THE 2014 STANDARD SPECIFICATIONS BOOK <br /> Revised: 8/3/15 <br />