My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ariston Pacific, Inc. 5/9/2016
>
Contracts
>
Capital Contract
>
Ariston Pacific, Inc. 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 10:38:43 AM
Creation date
5/20/2016 11:08:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Ariston Pacific, Inc.
Approval Date
5/9/2016
Council Approval Date
2/24/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Pacific & Broadway/Citywide Safety Impvts
Public Works WO Number
PW3523 & PW3524
Tracking Number
0000050
Total Compensation
$1,062,314.79
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Ariston Pacific, Inc. 4/17/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Public Works 10/18/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 6-07.3(10)L Environmental Condition Requirements Prior to Application of <br /> I 2 Paint <br /> 3 In the last paragraph, the second to last sentence is revised to read: <br /> 4 <br /> I <br /> 5 <br /> 6 If a paint system manufacturer's recommendations allow for application of a paint under <br /> environmental conditions other than those specified, the Contractor shall submit a Type <br /> 7 2 Working Drawing consisting of a letter from the paint manufacturer specifying the <br /> I <br /> 8 environmental conditions under which the paint can be applied. <br /> 9 <br /> 10 In the last sentence of the last paragraph, "approval" is revised to read "concurrence". <br /> 11 <br /> 1 12 6-07.3(11)B1 Submittals <br /> 13 The first paragraph (up until the colon) is revised to read: <br /> 14 <br /> I15 The Contractor shall submit Type 2 Working Drawings consisting of the following <br /> 16 information: <br /> 17 <br /> I 18 6-07.3(11)63 Galvanized Surface Cleaning and Preparation <br /> 19 The first paragraph is revised to read: <br /> 20 <br /> I <br /> 21 <br /> 22 Galvanized surfaces receiving the powder coating shall be cleaned and prepared for <br /> coating in accordance with ASTM D 6386, and the project-specific powder coating plan. <br /> 23 <br /> I 24 6-07.3(11)64 Powder Coating Application and Curing <br /> 25 The first paragraph (up until the colon) is revised to read: <br /> 26 <br /> I <br /> 27 <br /> 28 After surface preparation, the two-component powder coating shall be applied in <br /> accordance with the powder coating manufacturer's recommendations, the project- <br /> 29 specific powder coating plan, and as follows: <br /> 30 <br /> I <br /> 31 6-07.3(11)65 Testing <br /> 32 In the fifth sentence of the first paragraph, the phrase "as approved by the Engineer" is <br /> 33 deleted. <br /> I <br /> 34 <br /> 35 The second paragraph is revised to read: <br /> 36 <br /> I 37 The results of the QC testing shall be documented in a QC report, and submitted as a <br /> 38 Type 2 Working Drawing. <br /> 39 <br /> I 40 In the fourth paragraph, the phrase "as approved by the Engineer" is deleted. <br /> 41 <br /> 42 In the last paragraph, "Engineer's approval" is revised to read "Engineer's acceptance". <br /> I 43 <br /> 44 6-07.3(11)66 Coating Protection for Shipping <br /> 45 The phrase "as approved by the Engineer" is deleted from this section. <br /> 46 <br /> I47 The first sentence of the last paragraph is revised to read: <br /> 48 <br /> 49 After erection, all coating damage due to the Contractor's shipping, storage, handling, <br /> 1 50 and erection operations shall be repaired by the Contractor in accordance with the <br /> 51 project-specific powder coating plan. <br /> 52 <br /> I <br /> I AMENDMENTS TO THE 2014 STANDARD SPECIFICATIONS BOOK <br /> Revised: 8/3/15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.