My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ariston Pacific, Inc. 5/9/2016
>
Contracts
>
Capital Contract
>
Ariston Pacific, Inc. 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 10:38:43 AM
Creation date
5/20/2016 11:08:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Ariston Pacific, Inc.
Approval Date
5/9/2016
Council Approval Date
2/24/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Pacific & Broadway/Citywide Safety Impvts
Public Works WO Number
PW3523 & PW3524
Tracking Number
0000050
Total Compensation
$1,062,314.79
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Ariston Pacific, Inc. 4/17/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Public Works 10/18/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 1 6-07.5 Payment <br /> 2 The following new paragraph is inserted before the last paragraph: <br /> 3 <br /> 4 All costs in connection with producing the metallic coatings as specified shall be <br /> 5 included in the unit contract price for the applicable item or items of work. <br /> 6 <br /> 7 6-09.AP6 <br /> 8 Section 6-09, Modified Concrete Overlays , <br /> 9 January 5, 2015 <br /> 10 6-09.2 Materials I <br /> 11 The second sentence of the fifth paragraph is revised to read: <br /> 12 <br /> 13 Microsilica will be accepted based on submittal of a Manufacturer's Certificate of <br /> 14 Compliance. <br /> 15 <br /> 16 The seventh paragraph is revised to read: <br /> 17 <br /> 18 Latex admixture will be accepted based on submittal of a Manufacturer's Certificate of <br /> 19 Compliance. <br /> 20 <br /> 21 6-09.3(1)H Mobile Mixer for Latex Modified Concrete <br /> 22 In item number 2 of the first paragraph, "An approved recording meter" is revised to read "A <br /> 23 recording meter". <br /> 24 <br /> 25 In item number 3 of the first paragraph, "an approved flow meter" is revised to read "a flow <br /> 26 meter". <br /> 27 <br /> 28 6-09.3(1)J Finishing Machine <br /> 29 The last two sentences of the last paragraph are revised to read: <br /> 30 <br /> 31 A machine with a vibrating pan as an integral part may be proposed. Other finishing <br /> 32 machines will be allowed subject to concurrence of the Engineer. <br /> 33 <br /> 34 6-09.3(2) Submittals <br /> 35 This section is revised to read: <br /> 36 <br /> 37 The Contractor shall submit the following Working Drawings in accordance with Section <br /> 38 1-05.3: <br /> 39 <br /> 40 1. A Type 1 Working Drawing of the type of machine (rotary milling, hydro- <br /> 41 demolition, or shot blasting) selected by the Contractor for use in this project to <br /> 42 scarify concrete surfaces. <br /> 43 <br /> 44 2. A Type 1 Working Drawing of the axle loads and axle spacing of the rotary <br /> 45 milling machine (if used). <br /> 46 <br /> 47 3. A Type 2 Working Drawing of the Runoff Water Disposal Plan (if a hydro- <br /> 48 demolition machine is used). The Runoff Water Disposal Plan shall describe all <br /> 49 provisions for the containment, collection, filtering, and disposal of all runoff <br /> 50 water and associated contaminants generated by the hydro-demolition process, <br /> I <br /> AMENDMENTS TO THE 2014 STANDARD SPECIFICATIONS BOOK <br /> Revised: 8/3/15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.