My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ariston Pacific, Inc. 5/9/2016
>
Contracts
>
Capital Contract
>
Ariston Pacific, Inc. 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 10:38:43 AM
Creation date
5/20/2016 11:08:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Ariston Pacific, Inc.
Approval Date
5/9/2016
Council Approval Date
2/24/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Pacific & Broadway/Citywide Safety Impvts
Public Works WO Number
PW3523 & PW3524
Tracking Number
0000050
Total Compensation
$1,062,314.79
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Ariston Pacific, Inc. 4/17/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Public Works 10/18/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 including containment, collection and disposal of runoff water and debris <br /> ' 2 escaping through breaks in the bridge deck. <br /> 3 <br /> 4 4. A Type 2 Working Drawing of the method and materials used to contain, collect, <br /> ' 5 and dispose of all concrete debris generated by the scarifying process, <br /> 6 including provisions for protecting adjacent traffic from flying debris. <br /> 7 <br /> 8 5. A Type 1 Working Drawing of the mix design for concrete Class M, and either <br /> I 9 fly ash modified concrete, microsilica modified concrete, or latex modified <br /> 10 concrete, as selected by the Contractor for use in this project in accordance <br /> 11 with Section 6-09.3(3). <br /> 12 <br /> 13 6. A Type 1 Working Drawing of samples of the latex admixture and the portland <br /> 14 cement for testing and compatibility (if latex modified concrete is used). <br /> ' 15 <br /> 16 7. A Type 2 Working Drawing of the paving equipment specifications and details <br /> 17 of the screed rail support system, including details of anchoring the rails and <br /> 18 providing rail continuity. <br /> 19 <br /> 20 6-09.3(3)A General <br /> 21 In the last paragraph, the phrase "and as approved by the Engineer" is deleted. <br /> 22 <br /> 23 6-09.3(4)B Latex Admixture <br /> 24 In the second sentence of the second paragraph, the phrase "and as approved by the <br /> 25 Engineer" is deleted. <br /> 26 <br /> 27 6-09.3(5)A General <br /> 28 The second paragraph is deleted. <br /> 29 <br /> 30 In the third and fourth paragraphs, the phrase "and as approved by the Engineer" is deleted. <br /> 31 <br /> 32 In the fifth paragraph, "approved by the Engineer" is revised to read "acceptable to the <br /> 33 Engineer". <br /> ' 34 <br /> 35 6-09.3(5)B Testing of Hydro-Demolition and Shot Blasting Machines <br /> 36 In the last sentence of the last paragraph, "approval" is revised to read "acceptance". <br /> 37 <br /> 38 6-09.3(5)C Hydro-Demolishing <br /> 39 In the third and fourth paragraphs, the phrase "as approved by the Engineer" is deleted. <br /> I 40 <br /> 41 6-09.3(6)B Deck Repair Preparation <br /> 42 The second to last paragraph is revised to read the following three new paragraphs: <br /> 43 <br /> 44 The exposed steel reinforcing bars and concrete in the repair area shall be sandblasted <br /> 45 or hydro-blasted and blown clean just prior to placing concrete. <br /> ' 46 <br /> 47 Where existing steel reinforcing bars inside deck repair areas show deterioration <br /> 48 exceeding the limits defined in the Plans, the Contractor shall furnish and place steel <br /> 49 reinforcing bars alongside the deteriorated bars in accordance with the details shown in <br /> ' 50 the Plans. Payment for such extra Work will be by force account as provided in Section <br /> 51 1-09.6. <br /> 52 <br /> 111 <br /> ' AMENDMENTS TO THE 2014 STANDARD SPECIFICATIONS BOOK <br /> Revised: 8/3/15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.