My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ariston Pacific, Inc. 5/9/2016
>
Contracts
>
Capital Contract
>
Ariston Pacific, Inc. 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 10:38:43 AM
Creation date
5/20/2016 11:08:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Ariston Pacific, Inc.
Approval Date
5/9/2016
Council Approval Date
2/24/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Pacific & Broadway/Citywide Safety Impvts
Public Works WO Number
PW3523 & PW3524
Tracking Number
0000050
Total Compensation
$1,062,314.79
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Ariston Pacific, Inc. 4/17/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Public Works 10/18/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 6-09.3(10)A Survey of Existing Bridge Deck Prior to Scarification <br /> ' 2 The third sentence of the fourth paragraph is revised to read: <br /> 3 <br /> 4 A Type 1 Working Drawing of each day's survey record shall be provided to the <br /> ' 5 Engineer within three working days after the end of the shift. <br /> 6 <br /> 7 6-09.3(10)B Establishing Finish Overlay Profile <br /> ' 8 In the fourth sentence of the first paragraph, "approved by the Engineer" is revised to read <br /> 9 "specified by the Engineer". <br /> 10 <br /> 11 In the second paragraph, the phrase "and as approved by the Engineer" is deleted. <br /> 1 12 <br /> 13 6-09.3(11) Placing Concrete Overlay <br /> 14 In the fourth paragraph, the last sentence of item number 3 is revised to read: <br /> ' 15 <br /> 16 If the Contractor elects to work at night to meet these criteria, adequate lighting shall be <br /> 17 provided at no additional expense to the Contracting Agency. <br /> ' 18 <br /> 19 6-09.4 Measurement <br /> 20 The last paragraph is deleted and replaced with the following: <br /> I 21 <br /> 22 Further deck preparation for Type 1 deck repair and for Type 2 deck repair will be <br /> 23 measured by the square foot of surface area of deck concrete removed in accordance <br /> 24 with Section 6-09.3(6). <br /> 25 <br /> 26 6-09.5 Payment <br /> ' 27 The Bid item "Further Deck Preparation", per cubic foot and the paragraph following this Bid <br /> 28 item are deleted and replaced with the following two new Bid items: <br /> 29 <br /> 30 "Further Deck Preparation for Type 1 Deck Repair", per square foot. <br /> 31 <br /> 32 "Further Deck Preparation for Type 2 Deck Repair", per square foot. <br /> 33 <br /> ' 34 The Bid item "Further Deck Preparation", force account and the paragraph following this Bid <br /> 35 item are deleted. <br /> 36 <br /> 37 6-10.AP6 <br /> 38 Section 6-10, Concrete Barrier <br /> ' 39 January 5, 2015 <br /> 40 6-10.1 Description <br /> ' 41 In the second paragraph, "approved" is revised to read "specified". <br /> 42 <br /> 43 6-10.3 Construction Requirements <br /> 44 In the first paragraph, "approved" is revised to read "specified". <br /> 45 <br /> 46 6-10.3(5) Temporary Concrete Barrier <br /> ' 47 The last sentence of the first paragraph is deleted. <br /> 48 <br /> 49 The second paragraph is revised to read: <br /> ' AMENDMENTS TO THE 2014 STANDARD SPECIFICATIONS BOOK <br /> Revised: 8/3/15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.