My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 3129-09
>
Ordinances
>
Ordinance 3129-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2016 9:14:46 AM
Creation date
11/3/2016 9:14:02 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
3129-09
Date
6/17/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Background Information <br /> • Provides for fish passage into the Marshland Canal through or around the pump <br /> station <br /> • Provides fish access to the tributary channels from the adjacent hillsides <br /> Partially meets or does not meet objectives: <br /> • Requires significant infrastructure changes <br /> • Is the most costly of the three alternatives <br /> 2.4.3.4 Alternative 3: Maximum Restoration Alternative <br /> Meets objectives: <br /> • Provides for a large public trail system <br /> • Provides the largest amount of habitat restoration <br /> • Provides fish access to Wood Creek by allowing it to outlet into a tidally-influenced <br /> wetland area rather than the Marshland Canal <br /> • Provides for fish passage into the Marshland Canal through or around the pump <br /> station <br /> • Provides fish access to the tributary channels from the adjacent hillsides <br /> Partially meets or does not meet objectives: <br /> • Has limited passive recreation opportunities outside of trails <br /> • Requires significant infrastructure changes. <br /> Draft Subarea Plan June 2009 <br /> Everett Marshland 30 070346-01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.