My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
145 ALVERSON BLVD 2018-04-25
>
Address Records
>
ALVERSON BLVD
>
145
>
145 ALVERSON BLVD 2018-04-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2018 9:41:19 AM
Creation date
11/7/2016 7:58:59 AM
Metadata
Fields
Template:
Address Document
Street Name
ALVERSON BLVD
Street Number
145
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The purpose of this document is to describe the proposed construction activities and all <br />temporary and permanent erosion and sediment control measures, pollution prevention <br />measures, inspection/monitoring activities, and recordkeeping that will be implemented during <br />the proposed project. The objectives of the TESC Plan and SWPPP are to: <br />• Implement BMPs to minimize erosion and sedimentation from rainfall at construction <br />sites, and to identify, reduce, eliminate, or prevent the pollution of storm water. <br />• Prevent violations of surface water quality, groundwater quality, or sediment <br />management standards. This includes the protection of neighboring surface water <br />bodies, as well as the city-maintained storm water collection system. <br />� Prevent adverse water quality impacts, including impacts to beneficial uses of the <br />receiving water by controlling peak rates and volumes of storm water runoff at outfalls <br />from the subject site and downstream of outfalls. <br />The TESC Plan and SWPPP were prepared based on the requirements set forth in the Ecology <br />SWPPP Template and the Construction Storm Water General Permit, Storm Water <br />Management Manual for Western Washington (SWMWW 2005). The report is divided into <br />seven main sections with several appendices that include storm water related reference <br />materials. The topics presented in each of the main sections include the following: <br />• Section 1— Introduction: This section provides a summary description of the project, <br />and the organization of the TESC Plan Narrative/SWPPP document. <br />• Section 2— Site Description: This section provides a detailed description of the existing <br />site conditions, proposed construction activities, and calculated storm water flow rates <br />for existing conditions and post-construction conditions. <br />• Section 3— Construction BMPs: This section provides a detailed description of the BMPs <br />to be implemented based on the 12 required elements of the TESC Plan <br />Narrative/SWPPP (SWMWW 2005). <br />• Section 4— Construction Phasin� and BMP Implementation: This section provides a <br />description of the timing of the BMP implementation in relation to the project schedule. <br />TESC Plan and SWPPP 2 June 2015 <br />American Legion Memorial Park Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.